2500 SH 71 Svrd
Austin, TX 78719
2500 SH 71 Svrd: 2 projects on record
City of Austin lists 2 filings across 2 projects at 2500 SH 71 Svrd, Austin, TX 78719. The most recent, filed March 2, 2007, covers: “Abia-west runway system, fillet widening at taxiway g and t (revision)”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 2
- 2 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 2500 SH 71 Svrd
What is being built at 2500 SH 71 Svrd?
The latest filing (City of Austin case 205929, March 2, 2007) covers abia-west runway system, fillet widening at taxiway g and t (revision).
How many permits and filings does 2500 SH 71 Svrd have?
2 filings across 2 projects, from March 2, 2007 to March 2, 2007.
Is there other construction near 2500 SH 71 Svrd?
Yes. Nearby filings include 2502 SH 71 Svrd (a-bia air cargo apron and road development, Mar 2, 2007); 2512-1/2 Presidential Blvd (abia north reclaimed water loop main, Sep 14, 2026); 2401 Cardinal Loop (starbucks cardinal loop, Jan 21, 2022).
How do I get alerts for new permits at 2500 SH 71 Svrd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78719- 2502 SH 71 SvrdMar 2, 2007A-bia air cargo apron and road development · 7 m away
- 2512-1/2 Presidential BlvdSep 14, 2026Abia north reclaimed water loop main · 42 m away
- 2401 Cardinal LoopJan 21, 2022Starbucks cardinal loop · 116 m away
- 2475 SH 71 SvrdJul 16, 2026Circle k · 127 m away
- 2463 E SH 71 Svrd WbMar 13, 2026Updating an old service that got damaged by a trash truck because overhead was to low replacing 2 disconnects 2 meter base and raising overhead ***per ec: the meters are together but it has 2 different addresses (the ones listed on the espa) but its mounted to the restaurant which is 2463 e sh 71 service road · 137 m away
- 2601 Cardinal LoopNov 17, 2026Aus tenant - sap aus parking phase 2 (revision) · 210 m away
- 2426 Cardinal LoopNov 6, 2026Aus tenant - sap aus parking phase 2 (lot construction) · 283 m away
- 2616-1/2 SH 71 SvrdOct 8, 2026Batx austin airport · 302 m away
- 9518 Hotel DrOct 29, 2015Abia scott airport parking development · 381 m away
- 2705 SH 71 SvrdJul 3, 2019Executesla · 426 m away
- 2454 Cardinal LoopJul 8, 2024Replace an existing optional standby generator automatic transfer switch and docking station on the existing equivalent pad; no extension is needed · 434 m away
- 9515 Hotel DrMar 2, 2007Hilton hotel at austin-bergstrom international airport · 486 m away
More demolitions in 78719.