Longview Phase 4 subdivision case under review
City of Austin records show a Longview Phase 4 subdivision case filed on November 18, 2026, and currently in review. Earlier records document activity for Longview Phases 1, 2 and 3, but the records provided do not specify what buildings or uses are planned.
Summarized from City of Austin records · updated Nov 18, 2026
- Projects
- 19
- 19 filings
- Latest filing
- Nov 18, 2026
- since Nov 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
19 projectsSources: City of Austin
Questions about 6001-1/2 Circuit Of The Americas Blvd
What is being built at 6001-1/2 Circuit Of The Americas Blvd?
Austin records show subdivision planning for Longview, including a Phase 4 case under review. The records provided do not specify planned buildings or uses.
What is Longview Phase 4 in Austin?
It is a subdivision case at this address. The City of Austin filed case 13577939 on November 18, 2026; its status is In Review.
Has Longview Phase 4 been approved?
The latest Phase 4 record, case 13577939, was listed as In Review on November 18, 2026. An earlier Phase 4 case, 13526931, was also listed as In Review on January 12, 2026.
What is the status of Longview Phase 3?
City records show Phase 3 as Subdivision Recorded on May 29, 2026, under case 13307124. A separate Phase 3 case, 13373222, was Approved and Released on April 30, 2026.
What is the status of Longview Phase 2?
Longview Phase 2 case 13082915 was Approved and Released on March 17, 2026. Another Phase 2 record, case 12977967, was listed as Subdivision Recorded on June 30, 2025.
Are there records for Longview Phase 1?
Yes. The City of Austin listed Longview Phase 1 construction plans as Approved and Released on April 3, 2026, under case 12186269. A Phase 1 final plat was recorded on June 10, 2024, under case 12186264.
Also being built nearby
All of 78617- 6537-1/2 Circuit Of The Americas BlvdDec 20, 2024Longview offsite utilities phase 1 · 55 m away
- 13505-1/2 Muck DrMar 11, 2026Moores crossing · 454 m away
- 6120 Circuit Of The Americas BlvdOct 25, 2024Kellam road apartments · 514 m away
- 6029 Randleman DrNov 13, 2026Installation of energy storage system into existing solar panel system. in order to interconnect the ess equipment and perform a whole home backup for all customer loads we will need to schedule a meter pull so that the backup switch can be integrated to the existing utility meter · 538 m away
- 6025 Randleman DrSep 10, 2026Spot repair of approximately 10 ft of existing sewer line. repair to be completed by tunneling beneath the existing structure · 548 m away
- 6024 Randleman DrDec 1, 2025Hill - 39-11430 - install new 5.11kw rooftop solar system to existing residential only using backfed breaker · 578 m away