16601 Braker Ln
Austin, TX 78653
Evergreen at Whisper Valley Parcel 13 site plan approved
A site plan for The Evergreen at Whisper Valley (Parcel 13) was approved and released by the City of Austin on May 15, 2026. The case record does not specify what will be built on the parcel. A subdivision case for the parcel was recorded on April 4, 2024.
Summarized from City of Austin records · updated May 15, 2026
- Projects
- 5
- 5 filings
- Latest filing
- May 15, 2026
- since Mar 14, 2022
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsSources: City of Austin
Questions about 16601 Braker Ln
What is being planned at 16601 Braker Lane?
The City of Austin has an approved and released site plan case named The Evergreen at Whisper Valley (Parcel 13). The case record does not describe the proposed buildings or uses.
When was the Evergreen at Whisper Valley Parcel 13 site plan approved?
The City of Austin case was approved and released on May 15, 2026. Its case number is 12974954.
Was the subdivision for Evergreen at Whisper Valley Parcel 13 recorded?
Yes. The City of Austin recorded a subdivision case for The Evergreen at Whisper Valley (Parcel 13) on April 4, 2024, under case number 12989305.
Is construction underway at 16601 Braker Lane?
The records provided show an approved and released site plan, but do not confirm whether construction has started.
What will be built at Evergreen at Whisper Valley Parcel 13?
The project records identify a site plan and subdivision for Parcel 13 but do not specify the planned buildings, uses, or project size.
Also being built nearby
All of 78653- 16674-1/2 Braker LnApr 21, 2025Schoolfield offsite wastewater line · 245 m away
- 16528 Summery StOct 16, 2024Adding 2 double-gang outlets along one wall. i will be tying into an existing outlet opening the drywall to run the line through the studs to their locations under 10 feet away. the circuit will be gfci protected · 262 m away
- 16505 Summery StDec 18, 20232 access holes in dirt 80 feet of tunnel to repair leaks and backfall in sewer system · 319 m away
- 9809 Chirpy WayJul 23, 2025Slab penetration in garage and 5 tunnel to repair breaks on dual sewer mains under garage floor and delete broken clean out. install main line pvc double clean outs and 80 tunnel below the foundation to repair entire pvc drain system · 389 m away
- 16532 Fetching AveSep 9, 2026124 tunnel below the foundation to replace entire pvc drain system. 3 access holes - right front left · 416 m away
- 9449 Petrichor BlvdApr 4, 2024Stone crest at whisper valley - whisper valley village 1 section 2 · 425 m away
- 16400 Moonlit PathOct 25, 2025Whisper valley multifamily parcel 4 (with r sp-2023 0354c) · 435 m away
- 9504 Petrichor BlvdJan 29, 2024Install new 6.66 kwdc rooftop solar system servicing new residential only. bluebonnet utility · 439 m away
- 9514-1/2 Petrichor BlvdMar 14, 2025Whisper valley block u, lot 19 park & trail improvements · 463 m away
- 9520-1/2 Petrichor BlvdMar 14, 2025Whisper valley block a, lot 7 & 24 park & trail improvements · 501 m away
- 9516-1/2 Petrichor BlvdMar 14, 2025Whisper valley block q, lot 14 park & trail improvements · 506 m away
- 9522-1/2 Petrichor BlvdOct 16, 2026Whisper valley, block s, lots 16 and 22 park and trail improvements · 515 m away