16 IH 35 Svrd
Austin, TX 78701
Town Lake Lofts site plan approved at 16 IH 35 Svrd
A site plan for Town Lake Lofts at 16 IH 35 Svrd was approved and released by the City of Austin on February 27, 2025. Earlier site plan cases for North Shore Lofts and Town Lake Lofts were withdrawn or expired.
Summarized from City of Austin records · updated Feb 27, 2025
- Projects
- 5
- 5 filings
- Latest filing
- Feb 27, 2025
- since Feb 26, 2014
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsSources: City of Austin
Questions about 16 IH 35 Svrd
What is being built at 16 IH 35 Svrd in Austin?
City of Austin records show an approved and released site plan case named Town Lake Lofts, filed February 27, 2025. The records provided do not specify the project’s size or construction details.
Was the Town Lake Lofts plan approved?
Yes. City of Austin case 11695684, filed February 27, 2025, is listed as Approved and Released.
When was the site plan for 16 IH 35 Svrd filed?
The latest listed filing was February 27, 2025, for Town Lake Lofts. The address has earlier site plan records dating back to February 26, 2014.
Were earlier plans for North Shore Lofts at this address approved?
The listed North Shore Lofts site plan cases were not approved: one expired in 2014, and two later cases were withdrawn in 2015 and 2016.
What is happening near City Of Austin Rbj Parking Lot Ada Improvements?
At 16 IH 35 Svrd, about 154 meters from the parking lot project at 15 Waller Street, a Town Lake Lofts site plan was approved and released on February 27, 2025.
Also being built nearby
All of 78701- 15 Waller Street · Austin Public HealthJun 18, 2026City of austin rbj parking lot ada improvements — renovation/alteration — construct new handicap parking spaces and accessible ramp at building entrance; construct new curb ramps and sidewalk; approximate loc = 3000 sq ft · 154 m away
- 1101 Clermont AveDec 3, 2024Eplan: residential expedited review - new construction of a 3-story single-family res. [3bed 2.5bath] · 185 m away
- 1111 Clermont AveMar 14, 2024Construct new driveway approach of 16 ft · 205 m away
- 43 IH 35 SvrdSep 12, 2025Cooee yakka office · 252 m away
- 41 Waller StMar 10, 2025Replacement of complete existing central heat and air system with or without duct work replace existing hvac system and install a new braynt 2 ton · 265 m away
- 46-1/2 Waller StApr 14, 202046 waller alley project · 280 m away
- 1013 Lambie StJan 6, 20141013 lambie street · 295 m away
- 45 Waller StAug 12, 2008Magnolia addition, amended plat of lots 1-6, of the resub of lot 1, block 1 · 310 m away
- 48 Waller StDec 11, 2025New construction in-ground pool and spa · 314 m away
- 1107 Lambie StJun 15, 2026Replacement of an existing water heater replacing like/ like tankless water · 317 m away
- 36 East AveJul 18, 2024Swap out breaker panel - like for like · 328 m away
- 1011-1/2 Edgecliff TerOct 25, 2024The norwood house project: parking (with r sp-2018-0254d) · 339 m away