3002 E 18th St
Austin, TX 78702
3002 E 18th St: 4 projects on record
City of Austin lists 4 filings across 4 projects at 3002 E 18th St, Austin, TX 78702 since August 7, 2024. The most recent, filed May 9, 2025, covers: “Interior remodel”.
Compiled from City of Austin records · updated May 9, 2025
- Projects
- 4
- 4 filings
- Latest filing
- May 9, 2025
- since Aug 7, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsInterior remodel
Interior remodel
City of Austin permitBuilding PermitFinal- Record
- 2024-075172 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel
Interior remodel
City of Austin permitElectrical PermitFinal- Record
- 2024-075172 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel
Interior remodel
City of Austin permitMechanical PermitFinal- Record
- 2024-075172 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel
Interior remodel
City of Austin permitPlumbing PermitFinal- Record
- 2024-075172 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3002 E 18th St
What is being built at 3002 E 18th St?
The latest filing (City of Austin permit 2024-075172 BP, May 9, 2025) covers interior remodel.
How many permits and filings does 3002 E 18th St have?
4 filings across 4 projects, from August 7, 2024 to May 9, 2025.
Is there other construction near 3002 E 18th St?
Yes. Nearby filings include 1708 Harvey St (emergency after hours inspection replace damaged electrical meter can due to a failed phase. install new meter can and main breaker. no changes will be made to service size conductors or wiring configuration. work is like-for-like replacement, Aug 14, 2025); 3001 E 18th Half St (interior remodel - 2 story 3 bed 3.5 bath (adding square footage to second story within existing building footprint), Mar 14, 2024); 1800 Harvey St (this estimate is to perform and a full water line repipe for the home. this will include the water line in the yard and everything underneath the home. pipe material in the yard and partially under the home is galvanized pipe. the rest of the home is copper piping. we will redo all piping in pex. pex is extremely sturdy and more freeze restraint than any other pipe material. all work will include 1 year warranty, May 18, 2026).
How do I get alerts for new permits at 3002 E 18th St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78702- 1708 Harvey StAug 14, 2025Emergency after hours inspection replace damaged electrical meter can due to a failed phase. install new meter can and main breaker. no changes will be made to service size conductors or wiring configuration. work is like-for-like replacement · 45 m away
- 3001 E 18th Half StMar 14, 2024Interior remodel - 2 story 3 bed 3.5 bath (adding square footage to second story within existing building footprint) · 49 m away
- 1800 Harvey StMay 18, 2026This estimate is to perform and a full water line repipe for the home. this will include the water line in the yard and everything underneath the home. pipe material in the yard and partially under the home is galvanized pipe. the rest of the home is copper piping. we will redo all piping in pex. pex is extremely sturdy and more freeze restraint than any other pipe material. all work will include 1 year warranty · 56 m away
- 1704 Harvey StMay 13, 2024New pool 470 sq ft and spa 90 sq ft · 85 m away
- 3004 E 18th Half StMay 1, 2025Replacement of complete existing central heat and air system with or without duct work **working being done in building 1 only · 86 m away
- 1808 Harvey StJun 24, 2026Texas gas is repairing a gas leak on their main and want to relocate the gas meter to a safe location away from windows doorway crawl space vents · 88 m away
- 1812 Harvey StMar 25, 2024Cap off water/wastewater total demolition of sq ft unit 840sqft circa 1960 slab will remain ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage.*** same lot as 1814 harvey st · 111 m away
- 1706 Mc Kinley AveDec 12, 2023Express: replace windows like for like · 121 m away
- 3005 E Martin Luther King Jr BlvdJan 19, 2024Tee into external gas line and run additional line for generator installation · 124 m away
- 1811 Mc Kinley AveApr 9, 2026We have been asked to tunnel and replace existing cast iron drain lines for a residential home. we will be replacing the drain lines for the laundry room and kitchen. tunneling will take around 2 days and the replacement of the drain lines will take 2-3 days before backfilling · 127 m away
- 1809 Mc Kinley AveMar 12, 2024In ground swimming pool with required enclosure device for sfr without autofill · 129 m away
- 3007 E Martin Luther King Jr BlvdJun 6, 2024Install new subpanel · 130 m away