City of Austin lists 1 filing across 1 project at 3004 E 18th Half St, Austin, TX 78702. The most recent, filed May 1, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work **working being done in building 1 only”.
Compiled from City of Austin records · updated May 1, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 1, 2025
- since May 1, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work **working being done in building 1 only
Replacement of complete existing central heat and air system with or without duct work **working being done in building 1 only
City of Austin permitMechanical PermitFinal- Record
- 2025-045287 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3004 E 18th Half St
What is being built at 3004 E 18th Half St?
The latest filing (City of Austin permit 2025-045287 MP, May 1, 2025) covers replacement of complete existing central heat and air system with or without duct work **working being done in building 1 only.
How many permits and filings does 3004 E 18th Half St have?
1 filing across 1 project, from May 1, 2025 to May 1, 2025.
Is there other construction near 3004 E 18th Half St?
Yes. Nearby filings include 3005 E Martin Luther King Jr Blvd (tee into external gas line and run additional line for generator installation, Jan 19, 2024); 3007 E Martin Luther King Jr Blvd (install new subpanel, Jun 6, 2024); 3001 E 18th Half St (interior remodel - 2 story 3 bed 3.5 bath (adding square footage to second story within existing building footprint), Mar 14, 2024).
How do I get alerts for new permits at 3004 E 18th Half St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78702- 3005 E Martin Luther King Jr BlvdJan 19, 2024Tee into external gas line and run additional line for generator installation · 38 m away
- 3007 E Martin Luther King Jr BlvdJun 6, 2024Install new subpanel · 44 m away
- 3001 E 18th Half StMar 14, 2024Interior remodel - 2 story 3 bed 3.5 bath (adding square footage to second story within existing building footprint) · 46 m away
- 1812 Harvey StMar 25, 2024Cap off water/wastewater total demolition of sq ft unit 840sqft circa 1960 slab will remain ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage.*** same lot as 1814 harvey st · 60 m away
- 3011 E Martin Luther King Jr BlvdOct 19, 2026Express: demolition and remodel the shower stall area; convert from shower to tub. redo floor tile. reuse baseboard trim toilet and vanity. includes waterproofing shower valve piping tub and trim · 60 m away
- 1808 Harvey StJun 24, 2026Texas gas is repairing a gas leak on their main and want to relocate the gas meter to a safe location away from windows doorway crawl space vents · 63 m away
- 1814 Harvey StJul 29, 2025Install gfci outlets on pavilion supports for plug in fans. installing one circuit for 3 outlets · 73 m away
- 3002 E 18th StMay 9, 2025Interior remodel · 86 m away
- 1800 Harvey StMay 18, 2026This estimate is to perform and a full water line repipe for the home. this will include the water line in the yard and everything underneath the home. pipe material in the yard and partially under the home is galvanized pipe. the rest of the home is copper piping. we will redo all piping in pex. pex is extremely sturdy and more freeze restraint than any other pipe material. all work will include 1 year warranty · 91 m away
- 1811 Mc Kinley AveApr 9, 2026We have been asked to tunnel and replace existing cast iron drain lines for a residential home. we will be replacing the drain lines for the laundry room and kitchen. tunneling will take around 2 days and the replacement of the drain lines will take 2-3 days before backfilling · 96 m away
- 1809 Mc Kinley AveMar 12, 2024In ground swimming pool with required enclosure device for sfr without autofill · 111 m away
- 1708 Harvey StAug 14, 2025Emergency after hours inspection replace damaged electrical meter can due to a failed phase. install new meter can and main breaker. no changes will be made to service size conductors or wiring configuration. work is like-for-like replacement · 117 m away