3011 E Martin Luther King Jr Blvd
Austin, TX 78702
Bathroom shower-to-tub remodel at 3011 E MLK Jr Blvd
City of Austin permits filed October 14 and 19, 2026, indicate a bathroom remodel at this residential address, converting a shower to a tub and redoing the floor tile. The work also includes waterproofing and plumbing changes; both 2026 permits are listed as active.
Summarized from City of Austin records · updated Oct 19, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Oct 19, 2026
- since Jun 23, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayExpress: demolition and remodel the shower stall area; convert from shower to tub. redo floor tile. reuse baseboard trim toilet and vanity. includes waterproofing shower valve piping tub and trim
- AppliedOct 13, 2026
- IssuedOct 19, 2026
- WorkOct '26 – Apr '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
4 projectsExpress: demolition and remodel the shower stall area; convert from shower to tub. redo floor tile. reuse baseboard trim toilet and vanity. includes waterproofing shower valve piping tub and trim
Express: demolition and remodel the shower stall area; convert from shower to tub. redo floor tile. reuse baseboard trim toilet and vanity. includes waterproofing shower valve piping tub and trim
City of Austin permitPlumbing PermitActive- Record
- 2026-134936 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: demolition and remodel the shower stall area; convert from shower to tub. redo floor tile. reuse baseboard trim toilet and vanity. includes waterproofing shower valve piping tub and trim
Express: demolition and remodel the shower stall area; convert from shower to tub. redo floor tile. reuse baseboard trim toilet and vanity. includes waterproofing shower valve piping tub and trim
City of Austin permitBuilding PermitActive- Record
- 2026-134936 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: demolition and remodel the shower stall area convert from shower to tub. redo floor tile. re use base port trim toilet vanity includes waterproofing shower valve piping tub trim
Express: demolition and remodel the shower stall area convert from shower to tub. redo floor tile. re use base port trim toilet vanity includes waterproofing shower valve piping tub trim
City of Austin permitBuilding PermitActive- Record
- 2026-129944 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Removed 4 section of black iron piping that had zero pipe support and installed new 4 section and secured to plywood platform using flanged pipe clamps. installed new 1/2 quarter turn ball valve and new supply line
Removed 4 section of black iron piping that had zero pipe support and installed new 4 section and secured to plywood platform using flanged pipe clamps. installed new 1/2 quarter turn ball valve and new supply line
City of Austin permitPlumbing PermitFinal- Record
- 2025-077973 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3011 E Martin Luther King Jr Blvd
What is being built at 3011 E Martin Luther King Jr Blvd?
City permits describe a bathroom remodel converting a shower to a tub, with new floor tile and related plumbing and waterproofing work. The records do not describe a new building.
When were permits filed for work at 3011 E Martin Luther King Jr Blvd?
The City of Austin filed a building permit on October 14, 2026, and a plumbing permit on October 19, 2026. Both are listed as active.
What work do the permits cover at 3011 E Martin Luther King Jr Blvd?
Permits 2026-134936 BP and 2026-134936 PP cover converting the shower to a tub, redoing floor tile, and related waterproofing and plumbing work.
Is a new home being built at 3011 E Martin Luther King Jr Blvd?
The permits listed for this address describe bathroom remodeling and plumbing work, not new home construction.
Were there earlier plumbing permits at 3011 E Martin Luther King Jr Blvd?
Yes. A plumbing permit filed June 23, 2025, describes replacing and securing a section of black iron piping and installing a valve and supply line. Permit 2025-077973 PP is listed as final.
Also being built nearby
All of 78702- 3007 E Martin Luther King Jr BlvdJun 6, 2024Install new subpanel · 29 m away
- 3005 E Martin Luther King Jr BlvdJan 19, 2024Tee into external gas line and run additional line for generator installation · 41 m away
- 3004 E 18th Half StMay 1, 2025Replacement of complete existing central heat and air system with or without duct work **working being done in building 1 only · 60 m away
- 1811 Mc Kinley AveApr 9, 2026We have been asked to tunnel and replace existing cast iron drain lines for a residential home. we will be replacing the drain lines for the laundry room and kitchen. tunneling will take around 2 days and the replacement of the drain lines will take 2-3 days before backfilling · 78 m away
- 1925 Airport BlvdApr 13, 2026Replacement of grease interceptor · 90 m away
- 1901-1/2 Airport BlvdAug 9, 2023Aim: airport blvd: segment c2 from mlk blvd to 45th street · 97 m away
- 1809 Mc Kinley AveMar 12, 2024In ground swimming pool with required enclosure device for sfr without autofill · 98 m away
- 1814 Harvey StJul 29, 2025Install gfci outlets on pavilion supports for plug in fans. installing one circuit for 3 outlets · 100 m away
- 1812 Harvey StMar 25, 2024Cap off water/wastewater total demolition of sq ft unit 840sqft circa 1960 slab will remain ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage.*** same lot as 1814 harvey st · 103 m away
- 2950 Higgins StNov 16, 2023Repair damaged overhead service taken by falling tree · 104 m away
- 2952 Higgins StApr 9, 2025Replacement of an existing water heater water heater direct swap · 104 m away
- 3001 E 18th Half StMar 14, 2024Interior remodel - 2 story 3 bed 3.5 bath (adding square footage to second story within existing building footprint) · 105 m away