3007 E Martin Luther King Jr Blvd
Austin, TX 78702
3007 E Martin Luther King Jr Blvd: 1 project on record
City of Austin lists 1 filing across 1 project at 3007 E Martin Luther King Jr Blvd, Austin, TX 78702. The most recent, filed June 6, 2024, covers: “Install new subpanel”.
Compiled from City of Austin records · updated Jun 6, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 6, 2024
- since Jun 6, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall new subpanel
- AppliedMay 30, 2024
- IssuedJun 6, 2024
- WorkJun '24 – Nov '24
- Final inspectionNov 6, 2024
Passed final inspection Nov 6, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall new subpanel
Install new subpanel
City of Austin permitElectrical PermitFinal- Record
- 2024-068206 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3007 E Martin Luther King Jr Blvd
What is being built at 3007 E Martin Luther King Jr Blvd?
The latest filing (City of Austin permit 2024-068206 EP, June 6, 2024) covers install new subpanel.
How many permits and filings does 3007 E Martin Luther King Jr Blvd have?
1 filing across 1 project, from June 6, 2024 to June 6, 2024.
Is there other construction near 3007 E Martin Luther King Jr Blvd?
Yes. Nearby filings include 3005 E Martin Luther King Jr Blvd (tee into external gas line and run additional line for generator installation, Jan 19, 2024); 3011 E Martin Luther King Jr Blvd (express: demolition and remodel the shower stall area; convert from shower to tub. redo floor tile. reuse baseboard trim toilet and vanity. includes waterproofing shower valve piping tub and trim, Oct 19, 2026); 3004 E 18th Half St (replacement of complete existing central heat and air system with or without duct work **working being done in building 1 only, May 1, 2025).
How do I get alerts for new permits at 3007 E Martin Luther King Jr Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78702- 3005 E Martin Luther King Jr BlvdJan 19, 2024Tee into external gas line and run additional line for generator installation · 13 m away
- 3011 E Martin Luther King Jr BlvdOct 19, 2026Express: demolition and remodel the shower stall area; convert from shower to tub. redo floor tile. reuse baseboard trim toilet and vanity. includes waterproofing shower valve piping tub and trim · 29 m away
- 3004 E 18th Half StMay 1, 2025Replacement of complete existing central heat and air system with or without duct work **working being done in building 1 only · 44 m away
- 1814 Harvey StJul 29, 2025Install gfci outlets on pavilion supports for plug in fans. installing one circuit for 3 outlets · 71 m away
- 1812 Harvey StMar 25, 2024Cap off water/wastewater total demolition of sq ft unit 840sqft circa 1960 slab will remain ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage.*** same lot as 1814 harvey st · 75 m away
- 3001 E 18th Half StMar 14, 2024Interior remodel - 2 story 3 bed 3.5 bath (adding square footage to second story within existing building footprint) · 90 m away
- 1808 Harvey StJun 24, 2026Texas gas is repairing a gas leak on their main and want to relocate the gas meter to a safe location away from windows doorway crawl space vents · 93 m away
- 2941 Higgins StJul 21, 2026Replacement of an existing water heater replace existing tankless water heater · 96 m away
- 2950 Higgins StNov 16, 2023Repair damaged overhead service taken by falling tree · 98 m away
- 1811 Mc Kinley AveApr 9, 2026We have been asked to tunnel and replace existing cast iron drain lines for a residential home. we will be replacing the drain lines for the laundry room and kitchen. tunneling will take around 2 days and the replacement of the drain lines will take 2-3 days before backfilling · 101 m away
- 2952 Higgins StApr 9, 2025Replacement of an existing water heater water heater direct swap · 103 m away
- 2954 Higgins StJun 27, 2025Replace approximately 80 feet of sewer line in the front yard · 112 m away