1811 Mc Kinley Ave
Austin, TX 78702
Drain lines to be replaced at 1811 Mc Kinley Ave
A plumbing permit filed April 9, 2026, covers tunneling beneath a residential home at 1811 Mc Kinley Ave and replacing existing cast-iron drain lines. The work includes the laundry room and kitchen drains.
Summarized from City of Austin records · updated Apr 9, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 9, 2026
- since Apr 9, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledWe have been asked to tunnel and replace existing cast iron drain lines for a residential home. we will be replacing the drain lines for the laundry room and kitchen. tunneling will take around 2 days and the replacement of the drain lines will take 2-3 days before backfilling
- AppliedApr 7, 2026
- IssuedApr 9, 2026
- WorkApr '26 – May '26
- Final inspectionMay 11, 2026
Passed final inspection May 11, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectWe have been asked to tunnel and replace existing cast iron drain lines for a residential home. we will be replacing the drain lines for the laundry room and kitchen. tunneling will take around 2 days and the replacement of the drain lines will take 2-3 days before backfilling
We have been asked to tunnel and replace existing cast iron drain lines for a residential home. we will be replacing the drain lines for the laundry room and kitchen. tunneling will take around 2 days and the replacement of the drain lines will take 2-3 days before backfilling
City of Austin permitPlumbing PermitFinal- Record
- 2026-041914 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1811 Mc Kinley Ave
What work is permitted at 1811 Mc Kinley Ave in Austin?
A City of Austin plumbing permit covers tunneling beneath the home and replacing existing cast-iron drain lines for the laundry room and kitchen. The permit was filed April 9, 2026.
Is a new restaurant being built at 1811 Mc Kinley Ave?
The available permit is for plumbing work at a residential home, not restaurant construction. It covers replacing drain lines in the kitchen and laundry room.
When was the plumbing permit filed for 1811 Mc Kinley Ave?
The City of Austin permit was filed April 9, 2026. Its number is 2026-041914 PP.
What plumbing work is planned at 1811 Mc Kinley Ave?
The permit description says existing cast-iron drain lines for the laundry room and kitchen will be replaced. The work involves tunneling beneath the home.
How long will the drain work take at 1811 Mc Kinley Ave?
The permit description estimates about two days for tunneling and two to three days to replace the drain lines before backfilling.
Also being built nearby
All of 78702- 1809 Mc Kinley AveMar 12, 2024In ground swimming pool with required enclosure device for sfr without autofill · 20 m away
- 3011 E Martin Luther King Jr BlvdOct 19, 2026Express: demolition and remodel the shower stall area; convert from shower to tub. redo floor tile. reuse baseboard trim toilet and vanity. includes waterproofing shower valve piping tub and trim · 78 m away
- 1823 Airport BlvdMar 3, 2025Replace rpz at drive-thru window under hand sink (popeyes) · 88 m away
- 3004 E 18th Half StMay 1, 2025Replacement of complete existing central heat and air system with or without duct work **working being done in building 1 only · 96 m away
- 3007 E Martin Luther King Jr BlvdJun 6, 2024Install new subpanel · 101 m away
- 1901-1/2 Airport BlvdAug 9, 2023Aim: airport blvd: segment c2 from mlk blvd to 45th street · 103 m away
- 1811 Airport BlvdDec 29, 2025Description of work: the project scope includes the partial demolition of an existing concrete tilt up panel warehouse building and interior renovation for an indoor sports facility. new outdoor courts for assembly recreational use are proposed · 104 m away
- 1811 Airport Blvd · Building 1Jul 2, 2025Legacy padel — renovation/alteration — the project scope includes the interior renovation of an existing office building for an indoor sports facility. exterior remodel limited to finish updates and window replacement · 104 m away
- 3005 E Martin Luther King Jr BlvdJan 19, 2024Tee into external gas line and run additional line for generator installation · 108 m away
- 1925 Airport BlvdApr 13, 2026Replacement of grease interceptor · 110 m away
- 1706 Mc Kinley AveDec 12, 2023Express: replace windows like for like · 115 m away
- 3001 E 18th Half StMar 14, 2024Interior remodel - 2 story 3 bed 3.5 bath (adding square footage to second story within existing building footprint) · 123 m away
More restaurants in 78702.