1823 Airport Blvd
Austin, TX 78721
Plumbing permit for drive-thru window at 1823 Airport Blvd
A plumbing permit covers replacing the RPZ at the drive-thru window under the hand sink at 1823 Airport Blvd. The City of Austin filed permit 2025-020937 PP on March 3, 2025; its status is Final.
Summarized from City of Austin records · updated Mar 3, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 3, 2025
- since Mar 3, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace rpz at drive-thru window under hand sink (popeyes)
- AppliedFeb 21, 2025
- IssuedMar 3, 2025
- WorkMar '25 – Apr '25
- Final inspectionApr 14, 2025
Passed final inspection Apr 14, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace rpz at drive-thru window under hand sink (popeyes)
Replace rpz at drive-thru window under hand sink (popeyes)
City of Austin permitPlumbing PermitFinal- Record
- 2025-020937 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1823 Airport Blvd
What is being built at 1823 Airport Blvd?
The City of Austin permit describes plumbing work: replacing the RPZ at the drive-thru window under the hand sink. It does not describe a new building.
What does permit 2025-020937 PP cover?
The permit covers replacing the RPZ at the drive-thru window under the hand sink. It was filed March 3, 2025, and is marked Final.
When was the plumbing permit filed for 1823 Airport Blvd?
The City of Austin filed permit 2025-020937 PP on March 3, 2025.
Is a new restaurant opening at 1823 Airport Blvd?
The available permit describes plumbing work at a drive-thru window, not a restaurant opening.
What work is happening near Building 1 at 1811 Airport Blvd?
At 1823 Airport Blvd, about 20 meters from Building 1, permit 2025-020937 PP covers replacing the RPZ at the drive-thru window under the hand sink. The permit was filed March 3, 2025.
Also being built nearby
All of 78721- 1811 Airport BlvdDec 29, 2025Description of work: the project scope includes the partial demolition of an existing concrete tilt up panel warehouse building and interior renovation for an indoor sports facility. new outdoor courts for assembly recreational use are proposed · 20 m away
- 1811 Airport Blvd · Building 1Jul 2, 2025Legacy padel — renovation/alteration — the project scope includes the interior renovation of an existing office building for an indoor sports facility. exterior remodel limited to finish updates and window replacement · 20 m away
- 1805 Airport BlvdJul 25, 2026Airport blvd canopy · 38 m away
- 1809 Mc Kinley AveMar 12, 2024In ground swimming pool with required enclosure device for sfr without autofill · 70 m away
- 1811 Mc Kinley AveApr 9, 2026We have been asked to tunnel and replace existing cast iron drain lines for a residential home. we will be replacing the drain lines for the laundry room and kitchen. tunneling will take around 2 days and the replacement of the drain lines will take 2-3 days before backfilling · 88 m away
- 1705 Mc Kinley AveMay 1, 2025Express: replace 450sqft of siding and 200sqft of trim (paint to match) remove 1200sqft of damaged wall paneling scrape and patch drywall tape & float texture (paint to match). revision: remove non hot wires behind old siding run hot wires through metal conduit install gfci in front of house. install 80 lf of electrical conduit at exterior. replace an additional 225sqft of rotting siding. replace 1 exterior 32 door with fiberglass type same swing new hardware · 91 m away
- 1706 Mc Kinley AveDec 12, 2023Express: replace windows like for like · 99 m away
- 1901-1/2 Airport BlvdAug 9, 2023Aim: airport blvd: segment c2 from mlk blvd to 45th street · 147 m away
- 3204 E 17th StMar 24, 2025Excavate roughly 60 feet to expose the entire sewer yard line. excavation will be starting at the outside clean out and reach all the way to the city sewer tap. remove all exposed plumbing and replace using schedule 40 pvc bed in new line with sand per code · 158 m away
- 1925 Airport BlvdApr 13, 2026Replacement of grease interceptor · 161 m away
- 3011 E Martin Luther King Jr BlvdOct 19, 2026Express: demolition and remodel the shower stall area; convert from shower to tub. redo floor tile. reuse baseboard trim toilet and vanity. includes waterproofing shower valve piping tub and trim · 164 m away
- 3209 E 17th StOct 27, 2025Replacement of complete existing central heat and air system with or without duct work · 169 m away