1809 Mc Kinley Ave
Austin, TX 78702
1809 Mc Kinley Ave: 8 projects on record
City of Austin lists 8 filings across 8 projects at 1809 Mc Kinley Ave, Austin, TX 78702 since November 27, 2023. The most recent, filed March 12, 2024, covers: “In ground swimming pool with required enclosure device for sfr without autofill”.
Compiled from City of Austin records · updated Mar 12, 2024
- Projects
- 8
- 8 filings
- Latest filing
- Mar 12, 2024
- since Nov 27, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledIn ground swimming pool with required enclosure device for sfr without autofill
- AppliedNov 30, 2022
- IssuedMar 12, 2024
- WorkMar '24 – Aug '24
- Final inspectionAug 23, 2024
Passed final inspection Aug 23, 2024.
1 contact on this project · 1 phone number
Permit & project history
8 projectsIn ground swimming pool with required enclosure device for sfr without autofill
In ground swimming pool with required enclosure device for sfr without autofill
City of Austin permitElectrical PermitFinal- Record
- 2023-099728 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Construct new driveway approach of 12 ft. no sidewalk inspection per plan review
Construct new driveway approach of 12 ft. no sidewalk inspection per plan review
City of Austin permitDriveway / SidewalksFinal- Record
- 2023-099727 DS
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New 2-story sfr and 2-car garage with 4 bedrooms 4 bathrooms
New 2-story sfr and 2-car garage with 4 bedrooms 4 bathrooms
City of Austin permitMechanical PermitFinal- Record
- 2023-099727 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
In ground swimming pool with required enclosure device for sfr without autofill
In ground swimming pool with required enclosure device for sfr without autofill
City of Austin permitBuilding PermitFinal- Record
- 2023-099728 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New 2-story sfr and 2-car garage with 4 bedrooms 4 bathrooms
New 2-story sfr and 2-car garage with 4 bedrooms 4 bathrooms
City of Austin permitPlumbing PermitFinal- Record
- 2023-099727 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New 2-story sfr and 2-car garage with 4 bedrooms 4 bathrooms
New 2-story sfr and 2-car garage with 4 bedrooms 4 bathrooms
City of Austin permitElectrical PermitFinal- Record
- 2023-099727 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Provide electrical for a 100 amp temporary construction loop per duration of construction process ref. 2023-099727 bp
Provide electrical for a 100 amp temporary construction loop per duration of construction process ref. 2023-099727 bp
City of Austin permitElectrical PermitFinal- Record
- 2023-108892 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New 2-story sfr and 2-car garage with 4 bedrooms 4 bathrooms
New 2-story sfr and 2-car garage with 4 bedrooms 4 bathrooms
City of Austin permitBuilding PermitFinal- Record
- 2023-099727 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1809 Mc Kinley Ave
What is being built at 1809 Mc Kinley Ave?
The latest filing (City of Austin permit 2023-099728 EP, March 12, 2024) covers in ground swimming pool with required enclosure device for sfr without autofill.
How many permits and filings does 1809 Mc Kinley Ave have?
8 filings across 8 projects, from November 27, 2023 to March 12, 2024.
What is being built near Building 1 in Austin?
1809 Mc Kinley Ave is about 85 m from Building 1 (1811 Airport Blvd). Its latest filing is for in ground swimming pool with required enclosure device for sfr without autofill.
Is there other construction near 1809 Mc Kinley Ave?
Yes. Nearby filings include 1811 Mc Kinley Ave (we have been asked to tunnel and replace existing cast iron drain lines for a residential home. we will be replacing the drain lines for the laundry room and kitchen. tunneling will take around 2 days and the replacement of the drain lines will take 2-3 days before backfilling, Apr 9, 2026); 1823 Airport Blvd (replace rpz at drive-thru window under hand sink (popeyes), Mar 3, 2025); 1811 Airport Blvd (description of work: the project scope includes the partial demolition of an existing concrete tilt up panel warehouse building and interior renovation for an indoor sports facility. new outdoor courts for assembly recreational use are proposed, Dec 29, 2025).
How do I get alerts for new permits at 1809 Mc Kinley Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78702- 1811 Mc Kinley AveApr 9, 2026We have been asked to tunnel and replace existing cast iron drain lines for a residential home. we will be replacing the drain lines for the laundry room and kitchen. tunneling will take around 2 days and the replacement of the drain lines will take 2-3 days before backfilling · 20 m away
- 1823 Airport BlvdMar 3, 2025Replace rpz at drive-thru window under hand sink (popeyes) · 70 m away
- 1811 Airport BlvdDec 29, 2025Description of work: the project scope includes the partial demolition of an existing concrete tilt up panel warehouse building and interior renovation for an indoor sports facility. new outdoor courts for assembly recreational use are proposed · 85 m away
- 1811 Airport Blvd · Building 1Jul 2, 2025Legacy padel — renovation/alteration — the project scope includes the interior renovation of an existing office building for an indoor sports facility. exterior remodel limited to finish updates and window replacement · 85 m away
- 3011 E Martin Luther King Jr BlvdOct 19, 2026Express: demolition and remodel the shower stall area; convert from shower to tub. redo floor tile. reuse baseboard trim toilet and vanity. includes waterproofing shower valve piping tub and trim · 98 m away
- 1706 Mc Kinley AveDec 12, 2023Express: replace windows like for like · 99 m away
- 1805 Airport BlvdJul 25, 2026Airport blvd canopy · 107 m away
- 3004 E 18th Half StMay 1, 2025Replacement of complete existing central heat and air system with or without duct work **working being done in building 1 only · 111 m away
- 1901-1/2 Airport BlvdAug 9, 2023Aim: airport blvd: segment c2 from mlk blvd to 45th street · 115 m away
- 3007 E Martin Luther King Jr BlvdJun 6, 2024Install new subpanel · 120 m away
- 1705 Mc Kinley AveMay 1, 2025Express: replace 450sqft of siding and 200sqft of trim (paint to match) remove 1200sqft of damaged wall paneling scrape and patch drywall tape & float texture (paint to match). revision: remove non hot wires behind old siding run hot wires through metal conduit install gfci in front of house. install 80 lf of electrical conduit at exterior. replace an additional 225sqft of rotting siding. replace 1 exterior 32 door with fiberglass type same swing new hardware · 122 m away
- 1925 Airport BlvdApr 13, 2026Replacement of grease interceptor · 124 m away
More pools in 78702.