1811 Airport Blvd
Austin, TX 78702 · Building 1
Legacy Padel indoor sports facility planned for Airport Blvd
A 13,820-square-foot indoor sports facility is planned in an existing office building at 1811 Airport Blvd. A TDLR project registration filed July 2, 2025, describes an interior renovation and limited exterior work, including finish updates and window replacement. The applicant estimated the project cost at $800,000.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 2, 2025
- since Jul 2, 2025
- Largest scope
- 13,820 sf
- Estimated cost
- $800K
- state registration
Where this project stands
Finishing up · inspection nextLegacy Padel
13,820 sq ft · $800K est.
- RegisteredJul 2, 2025
- Plan review
- ConstructionAug '25 – Oct '25
- Inspectednow
- Closed
Scheduled to finish Oct 31, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectThe project scope includes the interior renovation of an existing office building for an indoor sports facility. exterior remodel limited to finish updates and window replacement. — building 1
TDLR project registrationRenovation/AlterationReview Complete13,820 sq ft$800K est.- Project #
- TABS2025022610
- Tenant / owner
- Legacy Padel
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1811 Airport Blvd
What is being built at 1811 Airport Blvd in Austin?
A TDLR registration for Legacy Padel describes renovating an existing office building for an indoor sports facility. The scope also includes limited exterior finish updates and window replacement.
Is Legacy Padel coming to 1811 Airport Blvd?
A TDLR project registration names Legacy Padel and describes an indoor sports facility at the address. The registration was filed July 2, 2025.
When was the 1811 Airport Blvd project permitted?
The TDLR project registration, TABS2025022610, was filed July 2, 2025. Its status is listed as Review Complete.
How large is the indoor sports facility at 1811 Airport Blvd?
The project registration lists a project area of 13,820 square feet.
How much will the 1811 Airport Blvd renovation cost?
The applicant's estimated cost for the project is $800,000. This is an estimate, not a reported final cost.
What work is planned at 1811 Airport Blvd?
The registered scope includes renovating the interior of an existing office building for an indoor sports facility. Exterior work is limited to finish updates and window replacement.
Also being built nearby
All of 78702- 1811 Airport BlvdDec 29, 2025Description of work: the project scope includes the partial demolition of an existing concrete tilt up panel warehouse building and interior renovation for an indoor sports facility. new outdoor courts for assembly recreational use are proposed
- 1823 Airport BlvdMar 3, 2025Replace rpz at drive-thru window under hand sink (popeyes) · 20 m away
- 1805 Airport BlvdJul 25, 2026Airport blvd canopy · 32 m away
- 1705 Mc Kinley AveMay 1, 2025Express: replace 450sqft of siding and 200sqft of trim (paint to match) remove 1200sqft of damaged wall paneling scrape and patch drywall tape & float texture (paint to match). revision: remove non hot wires behind old siding run hot wires through metal conduit install gfci in front of house. install 80 lf of electrical conduit at exterior. replace an additional 225sqft of rotting siding. replace 1 exterior 32 door with fiberglass type same swing new hardware · 75 m away
- 1809 Mc Kinley AveMar 12, 2024In ground swimming pool with required enclosure device for sfr without autofill · 85 m away
- 1706 Mc Kinley AveDec 12, 2023Express: replace windows like for like · 92 m away
- 1811 Mc Kinley AveApr 9, 2026We have been asked to tunnel and replace existing cast iron drain lines for a residential home. we will be replacing the drain lines for the laundry room and kitchen. tunneling will take around 2 days and the replacement of the drain lines will take 2-3 days before backfilling · 104 m away
- 3204 E 17th StMar 24, 2025Excavate roughly 60 feet to expose the entire sewer yard line. excavation will be starting at the outside clean out and reach all the way to the city sewer tap. remove all exposed plumbing and replace using schedule 40 pvc bed in new line with sand per code · 140 m away
- 3209 E 17th StOct 27, 2025Replacement of complete existing central heat and air system with or without duct work · 150 m away
- 1817 Tillery StFeb 18, 2025Eplan: residential expedited review - new construction of a 3-story single family res. [3bed 3.5bath] with attached garage. 1817 tillery st · 166 m away
- 1819 Tillery StFeb 19, 2025Eplan: residential expedited review - new construction of a 3-story single family res. [3bed 3.5bath] with attached garage. 1819 tillery st · 166 m away
- 1901-1/2 Airport BlvdAug 9, 2023Aim: airport blvd: segment c2 from mlk blvd to 45th street · 167 m away
More offices in 78702.