1901-1/2 Airport Blvd
Austin, TX 78723
1901-1/2 Airport Blvd: 1 project on record
City of Austin lists 1 filing across 1 project at 1901-1/2 Airport Blvd, Austin, TX 78723. The most recent, filed August 9, 2023, covers: “Aim: airport blvd: segment c2 from mlk blvd to 45th street”.
Compiled from City of Austin records · updated Aug 9, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Aug 9, 2023
- since Aug 9, 2023
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 1901-1/2 Airport Blvd
What is being built at 1901-1/2 Airport Blvd?
The latest filing (City of Austin case 12663779, August 9, 2023) covers aim: airport blvd: segment c2 from mlk blvd to 45th street.
How many permits and filings does 1901-1/2 Airport Blvd have?
1 filing across 1 project, from August 9, 2023 to August 9, 2023.
Is there other construction near 1901-1/2 Airport Blvd?
Yes. Nearby filings include 1925 Airport Blvd (replacement of grease interceptor, Apr 13, 2026); 3011 E Martin Luther King Jr Blvd (express: demolition and remodel the shower stall area; convert from shower to tub. redo floor tile. reuse baseboard trim toilet and vanity. includes waterproofing shower valve piping tub and trim, Oct 19, 2026); 3210 E Martin Luther King Jr Blvd (whataburger west elevation, Jun 11, 2026).
How do I get alerts for new permits at 1901-1/2 Airport Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 1925 Airport BlvdApr 13, 2026Replacement of grease interceptor · 17 m away
- 3011 E Martin Luther King Jr BlvdOct 19, 2026Express: demolition and remodel the shower stall area; convert from shower to tub. redo floor tile. reuse baseboard trim toilet and vanity. includes waterproofing shower valve piping tub and trim · 97 m away
- 3210 E Martin Luther King Jr BlvdJun 11, 2026Whataburger west elevation · 98 m away
- 3210 Martin Luther King Jr BlvdMar 2, 2007Whataburger drive-thru and parking improvements · 98 m away
- 1811 Mc Kinley AveApr 9, 2026We have been asked to tunnel and replace existing cast iron drain lines for a residential home. we will be replacing the drain lines for the laundry room and kitchen. tunneling will take around 2 days and the replacement of the drain lines will take 2-3 days before backfilling · 103 m away
- 2956 Higgins StOct 22, 2026Eplan: residential expedited review - new two units: building 2 new construction of 2-story single family res. [3bed 2.5bath] with attached carport · 107 m away
- 2954 Higgins StJun 27, 2025Replace approximately 80 feet of sewer line in the front yard · 115 m away
- 1809 Mc Kinley AveMar 12, 2024In ground swimming pool with required enclosure device for sfr without autofill · 115 m away
- 2009 Airport BlvdJul 7, 2026Installing 73.70 kw dc (60.00 kw ac) solar system with 134 alexus alex-550-w-144-s panels and 1 sca60ktl-do/us-480 inverter · 120 m away
- 2952 Higgins StApr 9, 2025Replacement of an existing water heater water heater direct swap · 124 m away
- 3007 E Martin Luther King Jr BlvdJun 6, 2024Install new subpanel · 124 m away
- 2950 Higgins StNov 16, 2023Repair damaged overhead service taken by falling tree · 136 m away