1500 Woodlawn Blvd
Austin, TX 78703
HVAC and water-heater replacement permits at 1500 Woodlawn Blvd
City of Austin permits indicate replacement work at the existing property, not a new building project. A water-heater replacement permit was filed February 13, 2025, and a central heating and air system replacement permit was filed October 8, 2025; the latter is listed as expired.
Summarized from City of Austin records · updated Oct 8, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 8, 2025
- since Feb 13, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of complete existing central heat and air system with or without duct work
- AppliedOct 1, 2025
- IssuedOct 8, 2025
- !WorkOct '25 – Apr '26
- Final inspection
Marked expired Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitExpired- Record
- 2025-125446 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2025-012717 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1500 Woodlawn Blvd
What is being built at 1500 Woodlawn Blvd?
City of Austin permit records show replacement work at the existing property: a water heater and the central heating and air system. They do not identify a new building project.
Is a new building going up at 1500 Woodlawn Blvd in Austin?
The records provided show permits for replacing existing equipment, not for new construction.
What HVAC work is permitted at 1500 Woodlawn Blvd?
Permit 2025-125446 MP, filed October 8, 2025, covers replacement of the complete existing central heat and air system, with or without duct work. Its status is listed as expired.
Was a water heater replacement permitted at 1500 Woodlawn Blvd?
Yes. City of Austin plumbing permit 2025-012717 PP, filed February 13, 2025, covers replacement of an existing water heater and is listed as final.
When were permits filed for 1500 Woodlawn Blvd?
The water-heater permit was filed February 13, 2025. The central heating and air system permit was filed October 8, 2025.
Also being built nearby
All of 78703- 1506 Woodlawn BlvdNov 20, 2024Express: remodel to existing detached garage-new garage door new sheathing new siding new roof (shingles) non structural work · 30 m away
- 1708 Enfield RdDec 10, 2024Repair gas leak in yard line and bring water heaters for units 5 6 7 and 9 up to code · 47 m away
- 1705 Enfield RdMay 30, 2024Replace existing yard utility sewer line from the street to house 140 4 schedule 40 · 58 m away
- 1410 Woodlawn BlvdJun 24, 2015Woodlawn terrace · 59 m away
- 1707 Enfield RdApr 4, 2010Penticuff subdivision, amended plat of lots 44 and 45 enfield "e · 65 m away
- 1507 Woodlawn BlvdOct 28, 2026Gas service to water heater [tankless] [electric to gas ] *fourplex- to unit b · 74 m away
- 1509 Woodlawn BlvdAug 7, 2025Install additional energy storage system only to existing system. overhead ae · 83 m away
- 1703 Summit VwJan 23, 20241703 summit view · 93 m away
- 1705 Summit VwAug 26, 2026* partial demolition* remodel master bathroom add carport · 104 m away
- 1713 Enfield RdFeb 26, 202490 feet of sewer line needs to be re-routed and converted to pvc. this will all be performed outside down the driveway of the property. the property has a total of 6-8 units · 105 m away
- 1403 Woodlawn BlvdApr 8, 2025Express: install new windows (like for like) · 107 m away
- 1621 Enfield RdMar 17, 2026Diagnostic revealed a leak on the tub drain for unit c and a belly on the main drain under unit c bathroom. - plan of action is to apply for a permit with the customers jurisdiction to legally and professionally proceed with repairs. - begin by excavating the entry hole at the back of the building outside of unit c. - then tunnel underneath the foundation of the building approximately 10 feet to access and expose noted diagnostic issues. - if additional tunneling or beam penetration is needed a supplemented estimate will be provided. - if any more work is needed such as solid rock removal roots or any unforeseeable objects come across this estimate will be supplemented to accommodate the additional work needed to complete the job. - defective drains will be removed from the plumbing system and debris will be hauled away. - drains will then be replaced with new dwv schedule 40 pvc pipe and fittings in accordance with plumbing code. - pipe will be well supported and strapped to underneath foundation to prevent the same thing happening in the future. - after work is completed we will then perform a static test on the entire drain system to ensure there are no further leaks. if additional leaks are found a separate estimate will be presented for the repair · 115 m away