1507 Woodlawn Blvd
Austin, TX 78703
Gas service permitted for a tankless water heater at 1507 Woodlawn
A City of Austin plumbing permit records gas service for a tankless water heater in Unit B of a fourplex at 1507 Woodlawn Blvd. The permit, which describes a switch from electric to gas, was filed October 28, 2026, and has a Final status.
Summarized from City of Austin records · updated Oct 28, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 28, 2026
- since Oct 28, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledGas service to water heater [tankless] [electric to gas ] *fourplex- to unit b
- AppliedOct 27, 2026
- IssuedOct 28, 2026
- WorkOct '26 – Nov '26
- Final inspectionNov 9, 2026
Passed final inspection Nov 9, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectGas service to water heater [tankless] [electric to gas ] *fourplex- to unit b
Gas service to water heater [tankless] [electric to gas ] *fourplex- to unit b
City of Austin permitPlumbing PermitFinal- Record
- 2026-141478 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1507 Woodlawn Blvd
What work is planned at 1507 Woodlawn Blvd?
A City of Austin plumbing permit records gas service for a tankless water heater in Unit B of the fourplex. The description notes a switch from electric to gas.
Is a new building being built at 1507 Woodlawn Blvd?
The available record is for gas service to a tankless water heater in Unit B, not a new building.
When was the permit for 1507 Woodlawn Blvd filed?
The plumbing permit was filed October 28, 2026. Its status is listed as Final.
What is the permit number for 1507 Woodlawn Blvd?
The City of Austin permit number is 2026-141478 PP. It covers gas service to a tankless water heater in Unit B.
Is the water heater at 1507 Woodlawn Blvd changing from electric to gas?
The permit description says “electric to gas” and specifies gas service to a tankless water heater in Unit B.
Also being built nearby
All of 78703- 1509 Woodlawn BlvdAug 7, 2025Install additional energy storage system only to existing system. overhead ae · 20 m away
- 1506 Woodlawn BlvdNov 20, 2024Express: remodel to existing detached garage-new garage door new sheathing new siding new roof (shingles) non structural work · 69 m away
- 1500 Woodlawn BlvdOct 8, 2025Replacement of complete existing central heat and air system with or without duct work · 74 m away
- 1600 Pease RdApr 9, 2025Repair water service line located under concrete by edge of building · 89 m away
- 1602 Pease RdApr 29, 202515 feet if exterior gas line feeding a generator · 90 m away
- 1601 Woodlawn BlvdOct 2, 2026Base: installing a backup battery system and additional meter socket · 91 m away
- 1512 Pease RdJan 23, 2024Repair sewer yard line · 92 m away
- 1510 Pease RdDec 16, 2025New pool · 94 m away
- 1608 Pease RdSep 12, 2026Eplan: residential expedited review - new construction of a 2-story duplex [3bed 4bath]. unit a · 94 m away
- 1508 Pease RdOct 23, 2026Total demolition of garage apartment 1700 sq ft circa 1947 · 95 m away
- 1621 Enfield RdMar 17, 2026Diagnostic revealed a leak on the tub drain for unit c and a belly on the main drain under unit c bathroom. - plan of action is to apply for a permit with the customers jurisdiction to legally and professionally proceed with repairs. - begin by excavating the entry hole at the back of the building outside of unit c. - then tunnel underneath the foundation of the building approximately 10 feet to access and expose noted diagnostic issues. - if additional tunneling or beam penetration is needed a supplemented estimate will be provided. - if any more work is needed such as solid rock removal roots or any unforeseeable objects come across this estimate will be supplemented to accommodate the additional work needed to complete the job. - defective drains will be removed from the plumbing system and debris will be hauled away. - drains will then be replaced with new dwv schedule 40 pvc pipe and fittings in accordance with plumbing code. - pipe will be well supported and strapped to underneath foundation to prevent the same thing happening in the future. - after work is completed we will then perform a static test on the entire drain system to ensure there are no further leaks. if additional leaks are found a separate estimate will be presented for the repair · 98 m away
- 1607 Pease RdFeb 19, 2026Interior remodel - reconfigure existing kitchen and pantry. new window at rear of home. no other changes to exterior · 104 m away