Energy storage system permitted at 1509 Woodlawn Blvd

Permits indicate an energy storage system and Tesla backup gateway were installed at the existing residence at 1509 Woodlawn Blvd. The first permits were filed January 24, 2024, with a later permit for additional energy storage filed August 7, 2025.

Summarized from City of Austin records · updated Aug 7, 2025

Projects
3
3 filings
Latest filing
Aug 7, 2025
since Jan 24, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install additional energy storage system only to existing system. overhead ae

  1. AppliedAug 4, 2025
  2. IssuedAug 7, 2025
  3. WorkAug '25 – Feb '26
  4. Final inspectionOct 21, 2025

Passed final inspection Oct 21, 2025.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Install additional energy storage system only to existing system. overhead ae

    Install additional energy storage system only to existing system. overhead ae

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Request to disconnect. install tesla backup gateway. overhead. ae. meter can not replaced - no espa

    Request to disconnect. install tesla backup gateway. overhead. ae. meter can not replaced - no espa

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Install energy storage system to existing residence. ae

    Install energy storage system to existing residence. ae

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1509 Woodlawn Blvd

What is being built at 1509 Woodlawn Blvd?

Austin permits indicate energy storage equipment was installed at the existing residence, including a Tesla backup gateway. A later permit covers additional energy storage.

Is a new home being built at 1509 Woodlawn Blvd?

The listed permits describe work to an existing residence, not construction of a new home. They cover an energy storage system and related electrical work.

When were the energy storage permits filed?

The first permits, 2024-003601 EP and 2024-005878 EP, were filed January 24, 2024. Permit 2025-098018 EP for additional energy storage was filed August 7, 2025.

What does permit 2025-098018 EP cover?

The August 7, 2025 Austin electrical permit describes installing an additional energy storage system to the existing system. Its status is listed as Final.

Does 1509 Woodlawn Blvd have a Tesla backup system?

An Austin permit filed January 24, 2024 describes installing a Tesla backup gateway. The same date, another permit covered an energy storage system at the existing residence.