1504 Murray Ln
Austin, TX 78703
Central heating and air system replacement at 1504 Murray Ln
A complete existing central heating and air system is being replaced at 1504 Murray Ln. The City of Austin’s active mechanical permit, dated June 4, 2026, describes a 2.5-ton horizontal gas system.
Summarized from City of Austin records · updated Jun 4, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 4, 2026
- since Jun 4, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayReplacement of complete existing central heat and air system with or without duct work 2.5 ton horizontal gas
- AppliedMay 28, 2026
- IssuedJun 4, 2026
- WorkJun '26 – Dec '26
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work 2.5 ton horizontal gas
Replacement of complete existing central heat and air system with or without duct work 2.5 ton horizontal gas
City of Austin permitMechanical PermitActive- Record
- 2026-067798 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1504 Murray Ln
What is being built at 1504 Murray Ln?
The permit describes replacement of the existing central heating and air system with a 2.5-ton horizontal gas system. It does not describe a new building.
Is a new home being built at 1504 Murray Ln?
The June 4, 2026, permit is for replacing an existing central heating and air system, not for building a new home.
When was the permit filed for 1504 Murray Ln?
The City of Austin mechanical permit was dated June 4, 2026.
What does permit 2026-067798 MP cover?
Permit 2026-067798 MP covers replacement of the complete existing central heat and air system with a 2.5-ton horizontal gas system. The permit is listed as active.
Does the 1504 Murray Ln permit include new ductwork?
The permit description says the system replacement may be with or without duct work; it does not specify whether ductwork will be replaced.
Also being built nearby
All of 78703- 1505 West Lynn StDec 7, 2023(dorman bill) - installation of circuit for elec. vehicle charging station-esip · 34 m away
- 1511 Murray LnAug 15, 2025Replacement of complete existing central heat and air system with or without duct work · 61 m away
- 1509 Murray LnSep 22, 2025Run 1 poly trenched approx. 15 to generator location · 62 m away
- 1513 Murray LnJun 30, 2026Build 225a temporary power service for construction. ref. 2026-029404 bp · 65 m away
- 1515 Murray LnFeb 12, 2026Run new water line from the yard under the foundation due to low water pressure connect from pvc to pex material to copper under the foundation. total length of yard line is about 20 feet · 73 m away
- 1503 Murray LnJan 2, 2024Gas line for whole home generator · 81 m away
- 1517 Murray LnJan 5, 2024Tee into external gas line and run additional line for generator installation · 85 m away
- 1504 West Lynn StDec 3, 2025Ornamental landscape trellis with no more than 20% solid area · 93 m away
- 1510 West Lynn StJun 29, 2026New construction of a pool and spa. the existing pool and spa will be demolished due to finding of asr (pool cancer) · 106 m away
- 1500 West Lynn StApr 2, 2026Replacement of complete existing central heat and air system with or without duct work · 107 m away
- 1704 Windsor RdOct 26, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 113 m away
- 1706 Windsor RdOct 7, 2025Interior remodel to existing residence with minor structural changes. revised ** 10/10/25 sm - enlarge her closet (add beam and 2x columns for load transfer) convert small office to his closet add interior wall to bring bathroom into bedroom. update lighting and receptacles · 117 m away