1511 Murray Ln
Austin, TX 78703
1511 Murray Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 1511 Murray Ln, Austin, TX 78703. The most recent, filed August 15, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Aug 15, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 15, 2025
- since Aug 15, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedAug 15, 2025
- IssuedAug 15, 2025
- WorkAug '25 – Aug '25
- Final inspectionAug 28, 2025
Passed final inspection Aug 28, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-103688 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1511 Murray Ln
What is being built at 1511 Murray Ln?
The latest filing (City of Austin permit 2025-103688 MP, August 15, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 1511 Murray Ln have?
1 filing across 1 project, from August 15, 2025 to August 15, 2025.
Is there other construction near 1511 Murray Ln?
Yes. Nearby filings include 1513 Murray Ln (build 225a temporary power service for construction. ref. 2026-029404 bp, Jun 30, 2026); 1509 Murray Ln (run 1 poly trenched approx. 15 to generator location, Sep 22, 2025); 1515 Murray Ln (run new water line from the yard under the foundation due to low water pressure connect from pvc to pex material to copper under the foundation. total length of yard line is about 20 feet, Feb 12, 2026).
How do I get alerts for new permits at 1511 Murray Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78703- 1513 Murray LnJun 30, 2026Build 225a temporary power service for construction. ref. 2026-029404 bp · 19 m away
- 1509 Murray LnSep 22, 2025Run 1 poly trenched approx. 15 to generator location · 31 m away
- 1515 Murray LnFeb 12, 2026Run new water line from the yard under the foundation due to low water pressure connect from pvc to pex material to copper under the foundation. total length of yard line is about 20 feet · 36 m away
- 1704 Windsor RdOct 26, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 53 m away
- 1517 Murray LnJan 5, 2024Tee into external gas line and run additional line for generator installation · 54 m away
- 1706 Windsor RdOct 7, 2025Interior remodel to existing residence with minor structural changes. revised ** 10/10/25 sm - enlarge her closet (add beam and 2x columns for load transfer) convert small office to his closet add interior wall to bring bathroom into bedroom. update lighting and receptacles · 57 m away
- 1504 Murray LnJun 4, 2026Replacement of complete existing central heat and air system with or without duct work 2.5 ton horizontal gas · 61 m away
- 1702 Windsor RdJun 14, 2011Enfield "b" subd, lots 17, 28, and 29 ; resubdivision · 77 m away
- 1505 West Lynn StDec 7, 2023(dorman bill) - installation of circuit for elec. vehicle charging station-esip · 93 m away
- 1710 Windsor RdOct 18, 2024Replacement of complete existing central heat and air system with or without duct work · 95 m away
- 1503 Murray LnJan 2, 2024Gas line for whole home generator · 98 m away
- 1601 West Lynn StJan 21, 2022Old enfield plat · 101 m away