groundranger
Recent · latest filing Feb 2026Residential

1515 Murray Ln

Austin, TX 78703

New water line permitted at 1515 Murray Ln

A new water line, about 20 feet long, was permitted at 1515 Murray Ln on February 12, 2026. The City of Austin permit describes routing it from the yard beneath the foundation to address low water pressure.

Summarized from City of Austin records · updated Feb 12, 2026

Projects
1
1 filings
Latest filing
Feb 12, 2026
since Feb 12, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Run new water line from the yard under the foundation due to low water pressure connect from pvc to pex material to copper under the foundation. total length of yard line is about 20 feet

  1. AppliedFeb 5, 2026
  2. IssuedFeb 12, 2026
  3. WorkFeb '26 – Feb '26
  4. Final inspectionFeb 17, 2026

Passed final inspection Feb 17, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Run new water line from the yard under the foundation due to low water pressure connect from pvc to pex material to copper under the foundation. total length of yard line is about 20 feet

    Run new water line from the yard under the foundation due to low water pressure connect from pvc to pex material to copper under the foundation. total length of yard line is about 20 feet

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1515 Murray Ln

What is being built at 1515 Murray Ln?

A City of Austin plumbing permit describes a new water line of about 20 feet running from the yard beneath the foundation. It was permitted February 12, 2026.

Is a new home being built at 1515 Murray Ln?

The available record is for plumbing work, not a new home. It covers a new water line routed beneath the foundation.

What work does permit 2026-014259 PP cover?

Permit 2026-014259 PP covers a new water line from the yard under the foundation, connecting PVC, PEX and copper materials. The permit was issued February 12, 2026.

Why is a new water line being installed at 1515 Murray Ln?

The permit description says the work is due to low water pressure. It describes running about 20 feet of water line beneath the foundation.

When was the plumbing work at 1515 Murray Ln permitted?

The City of Austin permit was filed on February 12, 2026. Its status is listed as Final.

Also being built nearby

All of 78703
Email me when a new permit is filed