2300 Westway Cir
Austin, TX 78704
Kitchen plumbing and HVAC work at 2300 Westway Cir
Permits indicate plumbing and HVAC work at 2300 Westway Cir, rather than a clearly identified new building. A September 9, 2026 plumbing permit describes a 15-foot tunnel to connect the kitchen line to PVC; a July 17, 2026 permit covers replacement of the existing central heating and air system.
Summarized from City of Austin records · updated Sep 9, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Sep 9, 2026
- since Feb 24, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled15 tunnel to follow kitchen line to pvc
- AppliedAug 28, 2026
- IssuedSep 9, 2026
- WorkSep '26 – Sep '26
- Final inspectionSep 22, 2026
Passed final inspection Sep 22, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projects15 tunnel to follow kitchen line to pvc
15 tunnel to follow kitchen line to pvc
City of Austin permitPlumbing PermitFinal- Record
- 2026-113168 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work hvac change out
Replacement of complete existing central heat and air system with or without duct work hvac change out
City of Austin permitMechanical PermitFinal- Record
- 2026-089464 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
30 ft. tunnel - replace cast iron pipe and fittings with pvc pipe and fittings
30 ft. tunnel - replace cast iron pipe and fittings with pvc pipe and fittings
City of Austin permitPlumbing PermitFinal- Record
- 2025-018545 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2300 Westway Cir
What is being built at 2300 Westway Cir in Austin?
The available permits describe plumbing and HVAC work, not a new building. The latest, permit 2026-113168 PP, was filed September 9, 2026, for a 15-foot tunnel to connect a kitchen line to PVC.
Is a new restaurant opening at 2300 Westway Cir?
The records do not identify a new restaurant opening or name an occupant. They show a kitchen-line plumbing permit and replacement of the existing central heating and air system.
What work does permit 2026-113168 PP cover?
The City of Austin plumbing permit, filed September 9, 2026, describes a 15-foot tunnel to follow the kitchen line to PVC. Its status is listed as Final.
What HVAC work is planned at 2300 Westway Cir?
Permit 2026-089464 MP, filed July 17, 2026, covers replacement of the existing central heating and air system, with or without duct work. Its status is listed as Final.
What is being worked on near Tumble 22 on South Lamar?
At 2300 Westway Cir, about 163 meters from Tumble 22, Austin permits show kitchen-line plumbing work and replacement of the existing central heating and air system. The records do not identify a new occupant.
Also being built nearby
All of 78704- 2324 Westforest DrDec 16, 2024Changing from overhead to underground. installing new meter can · 85 m away
- 2820 S Lamar BlvdJan 3, 2024Replacing existing 7 eleven trade equipment; no exterior or hvac system changes; store to remain open; no structural changes · 86 m away
- 2317 Westforest DrMar 5, 2025Replacement of complete existing central heat and air system with or without duct work located in livingroom closet · 97 m away
- 2328 Westforest DrJul 25, 2026New spa addition to existing pool. removing 108 sq ft of exsisting concrete and decking · 127 m away
- 2802-1/2 Lamar BlvdNov 18, 2026South lamar blvd street and utility improvements plan · 131 m away
- 2302 Barton SkwySep 2, 2026Tunnel up to 15 to replace 1 full bathroom drain lines. unit a · 132 m away
- 2800 Lamar BlvdJul 21, 2026Sola mixed use (with r sp-2023-0283c) · 140 m away
- 2801 S Lamar BlvdOct 6, 2025Tearing off tpo roof reroofing with all new tpo materials · 143 m away
- 2806 Skyway CirSep 11, 2026Replacement of complete existing central heat and air system with or without duct work · 144 m away
- 2304 Barton SkwyJun 10, 2024Replacement of complete existing central heat and air system with or without duct work · 145 m away
- 2320 Westoak DrFeb 20, 2024Construct new driveway approach of 12 ft and curb & gutter of 6 ft. no sidewalk inspection per plan review · 146 m away
- 2318 Westoak DrJul 22, 2025(martinez judy) - installation of circuit for elec. vehicle charging station - esip · 151 m away
More restaurants in 78704.