2820 S Lamar Blvd
Austin, TX 78704
7-Eleven equipment replacement at 2820 S Lamar Blvd
A City of Austin permit indicates existing 7-Eleven trade equipment is being replaced at 2820 S Lamar Blvd. The permit was filed January 3, 2024, and says the store will remain open, with no exterior, HVAC, or structural changes.
Summarized from City of Austin records · updated Jan 3, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 3, 2024
- since Jan 3, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacing existing 7 eleven trade equipment; no exterior or hvac system changes; store to remain open; no structural changes
- AppliedApr 25, 2022
- IssuedJan 3, 2024
- WorkJan '24 – Feb '24
- Final inspectionFeb 26, 2024
Passed final inspection Feb 26, 2024.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectReplacing existing 7 eleven trade equipment; no exterior or hvac system changes; store to remain open; no structural changes
Replacing existing 7 eleven trade equipment; no exterior or hvac system changes; store to remain open; no structural changes
City of Austin permitBuilding PermitFinal- Record
- 2022-069130 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2820 S Lamar Blvd
What is being built at 2820 S Lamar Blvd?
The permit describes replacement of existing 7-Eleven trade equipment, not a new building. It says there will be no structural changes.
Is a new 7-Eleven opening at 2820 S Lamar Blvd?
The permit describes work at an existing 7-Eleven and says the store will remain open. It does not indicate a new location is opening.
When was the permit for 2820 S Lamar Blvd filed?
The City of Austin permit, 2022-069130 BP, was filed January 3, 2024.
Will the work at 2820 S Lamar change the building's exterior?
The permit says there will be no exterior changes, HVAC system changes, or structural changes.
What's happening near Corners Shopping Center on South Lamar?
At 2820 S Lamar Blvd, a City of Austin permit indicates existing 7-Eleven trade equipment is being replaced. The permit says the store will remain open.
Also being built nearby
All of 78704- 2802-1/2 Lamar BlvdNov 18, 2026South lamar blvd street and utility improvements plan · 45 m away
- 2800 Lamar BlvdJul 21, 2026Sola mixed use (with r sp-2023-0283c) · 59 m away
- 2801 S Lamar BlvdOct 6, 2025Tearing off tpo roof reroofing with all new tpo materials · 83 m away
- 2805 Skyway CirJul 10, 2026Install 200amp service on a rack (200amp meter and panel) attn elec insp: any lighting installed is required to be full cut off/ fully shielded · 83 m away
- 2300 Westway CirSep 9, 202615 tunnel to follow kitchen line to pvc · 86 m away
- 2806 Skyway CirSep 11, 2026Replacement of complete existing central heat and air system with or without duct work · 110 m away
- 2715 Lamar BlvdJul 30, 2008Cypress - lamar/manchaca resubdivision · 128 m away
- 2324 Westforest DrDec 16, 2024Changing from overhead to underground. installing new meter can · 137 m away
- 2302 Barton SkwySep 2, 2026Tunnel up to 15 to replace 1 full bathroom drain lines. unit a · 144 m away
- 2300 Barton Village CirAug 8, 2025Emergency permit for a repair in the meter base for unit 104 · 146 m away
- 2304 Barton SkwyJun 10, 2024Replacement of complete existing central heat and air system with or without duct work · 158 m away
- 2709 S Lamar BlvdJun 17, 2026Cap off water & wastewater · 165 m away
More retail spaces in 78704.