groundranger
Active · latest filing Sep 2026Commercial

2806 Skyway Cir

Austin, TX 78704

Permits cover HVAC and water-heater replacements

Permits at 2806 Skyway Cir cover replacement of an existing central heating and air system and two water heaters. The water-heater permit was filed June 25, 2026, and the active mechanical permit for the HVAC replacement was filed September 11, 2026.

Summarized from City of Austin records · updated Sep 11, 2026

Projects
2
2 filings
Latest filing
Sep 11, 2026
since Jun 25, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Replacement of complete existing central heat and air system with or without duct work

  1. AppliedSep 11, 2026
  2. IssuedSep 11, 2026
  3. WorkSep '26 – Mar '27
  4. Final inspection
38% through of the permit windowSep 11, 2026 → Mar 10, 2027

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacing a 50gal natural gas water heater with a new 50 gal natural gas water heater in a residential home. unit 102 unit 104 (combined unit)

    Replacing a 50gal natural gas water heater with a new 50 gal natural gas water heater in a residential home. unit 102 unit 104 (combined unit)

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2806 Skyway Cir

What is being built at 2806 Skyway Cir?

The permits describe replacement work, not a new building: an existing central heating and air system and two 50-gallon natural gas water heaters.

What work is permitted at 2806 Skyway Cir in Austin?

A mechanical permit covers replacement of the complete existing central heat and air system, with or without ductwork. A separate plumbing permit covers replacing water heaters in units 102 and 104, described as a combined unit.

When were the permits filed for 2806 Skyway Cir?

The plumbing permit, 2026-081364 PP, was filed June 25, 2026. The mechanical permit, 2026-119412 MP, was filed September 11, 2026.

Is the HVAC replacement at 2806 Skyway Cir permitted?

The City of Austin record lists mechanical permit 2026-119412 MP as Active. It was filed September 11, 2026.

Are new water heaters being installed at 2806 Skyway Cir?

Yes. Plumbing permit 2026-081364 PP covers replacing 50-gallon natural gas water heaters in units 102 and 104, described in the permit as a combined unit. The record lists the permit as Final.

Also being built nearby

All of 78704
Email me when it passes final inspection