Electrical work at 2206 Rio Grande St dormitory

Electrical work to address breaker panels, deteriorated wiring and meter equipment serving dormitory units was permitted at 2206 Rio Grande St on August 19, 2024. The City of Austin record, permit 2024-103374 EP, is marked final and says the required work was completed and ready for inspection.

Summarized from City of Austin records · updated Aug 19, 2024

Projects
1
1 filings
Latest filing
Aug 19, 2024
since Aug 19, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Our customer recently purchased this (2206 rio grande st. building a) property and asked for an inspection of their facility. during the walkthrough we located several federal pacific breaker panels that were providing power to dormitory units and deemed these to need replacement. once work began we found load wires coming from the meter base were deteriorated to the point that the insulation was revealing the underlying conductor. we also identified 4 old meter bases that had been jumped using #10 wire providing the full 200a of power to the federal pacific panels that were to be replaced. due to all of these conditions we determined that the existing equipment could not safely remain energized. unfortunately this facility also lacked the presence of an emergency disconnect for these panels i attempted to reach out to the city of austin and austin energy via phone and email and received no response. due to the presence of these unsafe conditions the meter was removed to prevent damage to the property and its residents. i spoke with hyatt dunn who put me in touch with the on-call inspector dan kiser. dan was able to perform an initial inspection of our work via facetime and deemed it safe to release the meter and restore power and advised me to establish an emergency permit and final on-site inspection within 24-hours. at this time all of the required work has been completed and is ready for final inspection at the earliest possible time

  1. AppliedAug 15, 2024
  2. IssuedAug 19, 2024
  3. WorkAug '24 – Aug '24
  4. Final inspectionAug 21, 2024

Passed final inspection Aug 21, 2024.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Our customer recently purchased this (2206 rio grande st. building a) property and asked for an inspection of their facility. during the walkthrough we located several federal pacific breaker panels that were providing power to dormitory units and deemed these to need replacement. once work began we found load wires coming from the meter base were deteriorated to the point that the insulation was revealing the underlying conductor. we also identified 4 old meter bases that had been jumped using #10 wire providing the full 200a of power to the federal pacific panels that were to be replaced. due to all of these conditions we determined that the existing equipment could not safely remain energized. unfortunately this facility also lacked the presence of an emergency disconnect for these panels i attempted to reach out to the city of austin and austin energy via phone and email and received no response. due to the presence of these unsafe conditions the meter was removed to prevent damage to the property and its residents. i spoke with hyatt dunn who put me in touch with the on-call inspector dan kiser. dan was able to perform an initial inspection of our work via facetime and deemed it safe to release the meter and restore power and advised me to establish an emergency permit and final on-site inspection within 24-hours. at this time all of the required work has been completed and is ready for final inspection at the earliest possible time

    Our customer recently purchased this (2206 rio grande st. building a) property and asked for an inspection of their facility. during the walkthrough we located several federal pacific breaker panels that were providing power to dormitory units and deemed these to need replacement. once work began we found load wires coming from the meter base were deteriorated to the point that the insulation was revealing the underlying conductor. we also identified 4 old meter bases that had been jumped using #10 wire providing the full 200a of power to the federal pacific panels that were to be replaced. due to all of these conditions we determined that the existing equipment could not safely remain energized. unfortunately this facility also lacked the presence of an emergency disconnect for these panels i attempted to reach out to the city of austin and austin energy via phone and email and received no response. due to the presence of these unsafe conditions the meter was removed to prevent damage to the property and its residents. i spoke with hyatt dunn who put me in touch with the on-call inspector dan kiser. dan was able to perform an initial inspection of our work via facetime and deemed it safe to release the meter and restore power and advised me to establish an emergency permit and final on-site inspection within 24-hours. at this time all of the required work has been completed and is ready for final inspection at the earliest possible time

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2206 Rio Grande St

What is being built at 2206 Rio Grande St?

The City of Austin record lists electrical work, not a new building. The work addressed breaker panels and other electrical equipment serving dormitory units.

What electrical work was permitted at 2206 Rio Grande St?

Permit 2024-103374 EP covers work to replace Federal Pacific breaker panels and address deteriorated wiring and meter equipment. The permit was filed August 19, 2024.

Is a new dormitory being built at 2206 Rio Grande St?

The available record does not list new dormitory construction. It describes electrical work serving existing dormitory units.

When was the electrical permit for 2206 Rio Grande St filed?

The City of Austin electrical permit was filed August 19, 2024. Permit number 2024-103374 EP is marked final.

What is the status of the 2206 Rio Grande St permit?

The permit record is marked final. Its description says the required work had been completed and was ready for final inspection.