2208 Pearl St
Austin, TX 78705
HVAC replacement permit for Apartment 503 at 2208 Pearl St
A City of Austin mechanical permit filed Aug. 5, 2025, covers replacing the existing 2-ton air conditioner and air handler for Apartment 503, with or without duct work. The permit, 2025-096823 MP, is marked expired. A separate site-plan case titled “The Block at Pearl Street North (Smart Housing)” was approved and released in 2007.
Summarized from City of Austin records · updated Aug 5, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Aug 5, 2025
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of complete existing central heat and air system with or without duct work replacing 2 ton ac and air handler with new 2 ton ac and air handler apt503
- AppliedAug 1, 2025
- IssuedAug 5, 2025
- !WorkAug '25 – Mar '26
- Final inspection
Marked expired Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsReplacement of complete existing central heat and air system with or without duct work replacing 2 ton ac and air handler with new 2 ton ac and air handler apt503
Replacement of complete existing central heat and air system with or without duct work replacing 2 ton ac and air handler with new 2 ton ac and air handler apt503
City of Austin permitMechanical PermitExpired- Record
- 2025-096823 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Re-roof existing commercial building
Re-roof existing commercial building
City of Austin permitBuilding PermitFinal- Record
- 2022-164516 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2208 Pearl St
What is being built at 2208 Pearl St?
The latest record is a mechanical permit for replacing the existing 2-ton air conditioner and air handler serving Apartment 503. It does not describe a new building.
Is a new apartment building going up at 2208 Pearl St?
The records provided do not show a new building permit. The 2025 filing covers HVAC replacement in Apartment 503, and a site-plan case from 2007 was approved and released.
What does permit 2025-096823 MP cover?
Filed Aug. 5, 2025, the City of Austin permit covers replacing the existing 2-ton air conditioner and air handler for Apartment 503, with or without duct work.
Is the 2208 Pearl St permit still active?
No. City of Austin record 2025-096823 MP is marked expired.
What is the site-plan case for 2208 Pearl St?
Case 267999 is titled “The Block at Pearl Street North (Smart Housing).” It was approved and released on March 2, 2007.
What work is happening at 2208 Pearl St near 900 West 23rd?
The latest listed filing for 2208 Pearl St is an expired permit for HVAC replacement in Apartment 503. The nearby landmark 900 West 23rd is about 158 meters away.
Also being built nearby
All of 78705- 2200 Pearl StSep 16, 2025Structural repairs to floor and ceiling decking in apts 103 203 303 403 503 · 49 m away
- 904 W 22nd Half StSep 9, 2026Replacement of complete existing central heat and air system with or without duct work · 56 m away
- 2212 Pearl StMar 2, 2007Arrakis co-op · 64 m away
- 910 W 22nd Half StMar 19, 2026Express: replace one window like-for-like replace rotted wood/siding drywall repair roof repair exempt work (garage door replacement door replacement) · 95 m away
- 915 W 22nd Half StSep 3, 2024Replacement of an existing water heater · 110 m away
- 2222 Pearl StAug 30, 2007Block at 23rd street d permit (smart housing) · 111 m away
- 2206 Rio Grande StAug 19, 2024Our customer recently purchased this (2206 rio grande st. building a) property and asked for an inspection of their facility. during the walkthrough we located several federal pacific breaker panels that were providing power to dormitory units and deemed these to need replacement. once work began we found load wires coming from the meter base were deteriorated to the point that the insulation was revealing the underlying conductor. we also identified 4 old meter bases that had been jumped using #10 wire providing the full 200a of power to the federal pacific panels that were to be replaced. due to all of these conditions we determined that the existing equipment could not safely remain energized. unfortunately this facility also lacked the presence of an emergency disconnect for these panels i attempted to reach out to the city of austin and austin energy via phone and email and received no response. due to the presence of these unsafe conditions the meter was removed to prevent damage to the property and its residents. i spoke with hyatt dunn who put me in touch with the on-call inspector dan kiser. dan was able to perform an initial inspection of our work via facetime and deemed it safe to release the meter and restore power and advised me to establish an emergency permit and final on-site inspection within 24-hours. at this time all of the required work has been completed and is ready for final inspection at the earliest possible time · 123 m away
- 715 W 23rd StMar 12, 2025**the standard at austin; gas line repairs 7th flr bbq & fire pits · 133 m away
- 900 West 23rd · 900 West 23rd Po LLCJul 21, 2026900 west 23rd — new construction — new construction of off campus student housing · 158 m away
- 812 W 23rd StJul 10, 2026Reconstruction of water damage: drywall insulation paint trim and flooring. (20 units 7 corridors floors 1-8) · 165 m away
- 714 W 22nd StDec 11, 202580 mil fleece-back tpo layover installation · 168 m away
- 900 W 23rd StNov 3, 2026Cap off water and waste water · 168 m away