2212 Pearl St
Austin, TX 78705
2212 Pearl St: 1 project on record
City of Austin lists 1 filing across 1 project at 2212 Pearl St, Austin, TX 78705. The most recent, filed March 2, 2007, covers: “Arrakis co-op”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 1
- 1 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 2212 Pearl St
What is being built at 2212 Pearl St?
The latest filing (City of Austin case 214760, March 2, 2007) covers arrakis co-op.
How many permits and filings does 2212 Pearl St have?
1 filing across 1 project, from March 2, 2007 to March 2, 2007.
What is being built near 900 West 23rd Po in Austin?
2212 Pearl St is about 99 m from 900 West 23rd Po (900 West 23rd). Its latest filing is for arrakis co-op.
Is there other construction near 2212 Pearl St?
Yes. Nearby filings include 904 W 22nd Half St (replacement of complete existing central heat and air system with or without duct work, Sep 9, 2026); 2222 Pearl St (block at 23rd street d permit (smart housing), Aug 30, 2007); 2208 Pearl St (replacement of complete existing central heat and air system with or without duct work replacing 2 ton ac and air handler with new 2 ton ac and air handler apt503, Aug 5, 2025).
How do I get alerts for new permits at 2212 Pearl St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78705- 904 W 22nd Half StSep 9, 2026Replacement of complete existing central heat and air system with or without duct work · 40 m away
- 2222 Pearl StAug 30, 2007Block at 23rd street d permit (smart housing) · 48 m away
- 2208 Pearl StAug 5, 2025Replacement of complete existing central heat and air system with or without duct work replacing 2 ton ac and air handler with new 2 ton ac and air handler apt503 · 64 m away
- 715 W 23rd StMar 12, 2025**the standard at austin; gas line repairs 7th flr bbq & fire pits · 81 m away
- 910 W 22nd Half StMar 19, 2026Express: replace one window like-for-like replace rotted wood/siding drywall repair roof repair exempt work (garage door replacement door replacement) · 83 m away
- 900 West 23rd · 900 West 23rd Po LLCJul 21, 2026900 west 23rd — new construction — new construction of off campus student housing · 99 m away
- 812 W 23rd StJul 10, 2026Reconstruction of water damage: drywall insulation paint trim and flooring. (20 units 7 corridors floors 1-8) · 103 m away
- 900 W 23rd StNov 3, 2026Cap off water and waste water · 105 m away
- 2200 Pearl StSep 16, 2025Structural repairs to floor and ceiling decking in apts 103 203 303 403 503 · 112 m away
- 915 W 22nd Half StSep 3, 2024Replacement of an existing water heater · 128 m away
- 2206 Rio Grande StAug 19, 2024Our customer recently purchased this (2206 rio grande st. building a) property and asked for an inspection of their facility. during the walkthrough we located several federal pacific breaker panels that were providing power to dormitory units and deemed these to need replacement. once work began we found load wires coming from the meter base were deteriorated to the point that the insulation was revealing the underlying conductor. we also identified 4 old meter bases that had been jumped using #10 wire providing the full 200a of power to the federal pacific panels that were to be replaced. due to all of these conditions we determined that the existing equipment could not safely remain energized. unfortunately this facility also lacked the presence of an emergency disconnect for these panels i attempted to reach out to the city of austin and austin energy via phone and email and received no response. due to the presence of these unsafe conditions the meter was removed to prevent damage to the property and its residents. i spoke with hyatt dunn who put me in touch with the on-call inspector dan kiser. dan was able to perform an initial inspection of our work via facetime and deemed it safe to release the meter and restore power and advised me to establish an emergency permit and final on-site inspection within 24-hours. at this time all of the required work has been completed and is ready for final inspection at the earliest possible time · 148 m away
- 2222 Rio Grande StNov 12, 2026Replace fire pump motor and fire pump controller · 155 m away