groundranger
Historic · latest filing Oct 2024Residential

4909 Plum Peach Bnd

Austin, TX 78723

4909 Plum Peach Bnd: 4 projects on record

City of Austin lists 4 filings across 4 projects at 4909 Plum Peach Bnd, Austin, TX 78723 since November 30, 2023. The most recent, filed October 9, 2024, covers: “Install new 6.56kw rooftop solar system and 13.5kw energy storage system for existing residential only”.

Compiled from City of Austin records · updated Oct 9, 2024

Projects
4
4 filings
Latest filing
Oct 9, 2024
since Nov 30, 2023
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install new 6.56kw rooftop solar system and 13.5kw energy storage system for existing residential only

  1. AppliedOct 1, 2024
  2. IssuedOct 9, 2024
  3. WorkOct '24 – Apr '25
  4. Final inspectionApr 7, 2025

Passed final inspection Apr 7, 2025.

1 contact on this project · 1 phone number

Permit & project history

4 projects
  1. Install new 6.56kw rooftop solar system and 13.5kw energy storage system for existing residential only

    Install new 6.56kw rooftop solar system and 13.5kw energy storage system for existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Disconnect/reconnect power to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

    Disconnect/reconnect power to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Request to disconnect. install tesla backup gateway. ug. ae. meter can not replaced - no espa

    Request to disconnect. install tesla backup gateway. ug. ae. meter can not replaced - no espa

    City of Austin permitElectrical PermitWithdrawn
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Install new roof-mounted solar and energy storage system to existing residence. ae

    Install new roof-mounted solar and energy storage system to existing residence. ae

    City of Austin permitElectrical PermitWithdrawn
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4909 Plum Peach Bnd

What is being built at 4909 Plum Peach Bnd?

The latest filing (City of Austin permit 2024-132663 EP, October 9, 2024) covers install new 6.56kw rooftop solar system and 13.5kw energy storage system for existing residential only.

How many permits and filings does 4909 Plum Peach Bnd have?

4 filings across 4 projects, from November 30, 2023 to October 9, 2024.

Is there other construction near 4909 Plum Peach Bnd?

Yes. Nearby filings include 5307 Cobalt Canopy Bnd (install roof mounted solar - (14) 420w panels - 5.88 kw added (1) tesla powerwall 3 battery, Jun 29, 2026); 5402 Cobalt Canopy Bnd (replacement of an existing water heater replacement of a gas tankless water heater, Oct 14, 2026); 4822 Star Jasmine Dr (express: replace 5 windows like for like, May 12, 2026).

How do I get alerts for new permits at 4909 Plum Peach Bnd?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78723

More warehouses & industrial in 78723, solar installs in 78723.

Email me when a new permit is filed