5407 Golden Canary Ln
Austin, TX 78723
Backup battery system permitted at 5407 Golden Canary Ln
A City of Austin electrical permit indicates a backup battery system and additional meter socket are being installed at 5407 Golden Canary Ln. The permit, 2026-114677 EP, was filed on September 18, 2026, and is marked final.
Summarized from City of Austin records · updated Sep 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 18, 2026
- since Sep 18, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledBase: installing a backup battery system and additional meter socket
- AppliedSep 1, 2026
- IssuedSep 18, 2026
- WorkSep '26 – Oct '26
- Final inspectionOct 22, 2026
Passed final inspection Oct 22, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectBase: installing a backup battery system and additional meter socket
Base: installing a backup battery system and additional meter socket
City of Austin permitElectrical PermitFinal- Record
- 2026-114677 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5407 Golden Canary Ln
What is being installed at 5407 Golden Canary Ln?
A City of Austin electrical permit describes installation of a backup battery system and an additional meter socket.
When was the permit filed for 5407 Golden Canary Ln?
Permit 2026-114677 EP was filed on September 18, 2026.
Is the permit for the battery system at 5407 Golden Canary Ln final?
Yes. The City of Austin permit record lists permit 2026-114677 EP as final.
Is new construction planned at 5407 Golden Canary Ln?
The record is for an electrical permit describing a backup battery system and additional meter socket. It does not describe new building construction.
What does permit 2026-114677 EP cover?
The City of Austin record describes installing a backup battery system and an additional meter socket at 5407 Golden Canary Ln.
Also being built nearby
All of 78723- 5405 Golden Canary LnJul 21, 2025Install level 2 ev charger · 11 m away
- 5312 Mulberry Grove LnOct 28, 2026Base: installing a backup battery system and additional meter socket · 62 m away
- 5401 Mulberry Grove LnJun 18, 2025Request to disconnect installation of 200 amp mid on service with existing 200 amp meter to remain · 79 m away
- 5502 Golden Canary LnJun 5, 2024Irrigation · 81 m away
- 4610 Plum Peach BndAug 13, 2026Base: installing a backup battery system and additional meter socket · 101 m away
- 5402 Cobalt Canopy BndOct 14, 2026Replacement of an existing water heater replacement of a gas tankless water heater · 110 m away
- 5305 Basswood LnJul 30, 202510ft foot tunnel on the left side of home standing straight in front with up to 75ft sewer yard line replacement · 115 m away
- 4710 Plum Peach BndJun 17, 2025Ev install · 127 m away
- 5306 Basswood LnAug 18, 202565 tunnel below the foundation to replace entire drain system. 3 access holes- right back back · 128 m away
- 5308 Basswood LnMar 13, 2024Addition addition to increase size of master bed/bath new electrics/plumbing/drywall/windows/flooring install smoke detactors · 128 m away
- 5307 Cobalt Canopy BndJun 29, 2026Install roof mounted solar - (14) 420w panels - 5.88 kw added (1) tesla powerwall 3 battery · 138 m away
- 5213 Springdale RdNov 21, 2007Woodlands of austin · 141 m away