5305 Basswood Ln
Austin, TX 78723
5305 Basswood Ln: 2 projects on record
City of Austin lists 2 filings across 2 projects at 5305 Basswood Ln, Austin, TX 78723 since October 17, 2024. The most recent, filed July 30, 2025, covers: “10ft foot tunnel on the left side of home standing straight in front with up to 75ft sewer yard line replacement”.
Compiled from City of Austin records · updated Jul 30, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jul 30, 2025
- since Oct 17, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled10ft foot tunnel on the left side of home standing straight in front with up to 75ft sewer yard line replacement
- AppliedJul 28, 2025
- IssuedJul 30, 2025
- WorkJul '25 – Oct '25
- Final inspectionOct 1, 2025
Passed final inspection Oct 1, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projects10ft foot tunnel on the left side of home standing straight in front with up to 75ft sewer yard line replacement
10ft foot tunnel on the left side of home standing straight in front with up to 75ft sewer yard line replacement
City of Austin permitPlumbing PermitFinal- Record
- 2025-094103 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install evse
Install evse
City of Austin permitElectrical PermitFinal- Record
- 2024-137023 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5305 Basswood Ln
What is being built at 5305 Basswood Ln?
The latest filing (City of Austin permit 2025-094103 PP, July 30, 2025) covers 10ft foot tunnel on the left side of home standing straight in front with up to 75ft sewer yard line replacement.
How many permits and filings does 5305 Basswood Ln have?
2 filings across 2 projects, from October 17, 2024 to July 30, 2025.
Is there other construction near 5305 Basswood Ln?
Yes. Nearby filings include 5306 Basswood Ln (65 tunnel below the foundation to replace entire drain system. 3 access holes- right back back, Aug 18, 2025); 5308 Basswood Ln (addition addition to increase size of master bed/bath new electrics/plumbing/drywall/windows/flooring install smoke detactors, Mar 13, 2024); 5228 Basswood Ln (replacement of an existing water heater change out: install/ replace 50 gallon tank-type natural gas water heater, Mar 26, 2026).
How do I get alerts for new permits at 5305 Basswood Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 5306 Basswood LnAug 18, 202565 tunnel below the foundation to replace entire drain system. 3 access holes- right back back · 13 m away
- 5308 Basswood LnMar 13, 2024Addition addition to increase size of master bed/bath new electrics/plumbing/drywall/windows/flooring install smoke detactors · 13 m away
- 5228 Basswood LnMar 26, 2026Replacement of an existing water heater change out: install/ replace 50 gallon tank-type natural gas water heater · 93 m away
- 5203 Beechmoor DrJan 8, 2024Excavate 20 tunnel to repair drain line and excavate 70 to repair yardline · 96 m away
- 5502 Golden Canary LnJun 5, 2024Irrigation · 100 m away
- 3403 Norwood Hill RdAug 11, 2025Installation of an ev charger · 105 m away
- 5407 Golden Canary LnSep 18, 2026Base: installing a backup battery system and additional meter socket · 115 m away
- 5405 Golden Canary LnJul 21, 2025Install level 2 ev charger · 115 m away
- 5406 Basswood LnJul 2, 2024Automatic irrigation system using city potable water · 135 m away
- 3406 Norwood Hill RdApr 21, 2026Upgrade service · 147 m away
- 3402 Norwood Hill RdAug 11, 2025Replacement of complete existing central heat and air system with or without duct work · 152 m away
- 5312 Mulberry Grove LnOct 28, 2026Base: installing a backup battery system and additional meter socket · 154 m away