4710 Plum Peach Bnd
Austin, TX 78723
4710 Plum Peach Bnd: 1 project on record
City of Austin lists 1 filing across 1 project at 4710 Plum Peach Bnd, Austin, TX 78723. The most recent, filed June 17, 2025, covers: “Ev install”.
Compiled from City of Austin records · updated Jun 17, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 17, 2025
- since Jun 17, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEv install
- AppliedJun 13, 2025
- IssuedJun 17, 2025
- WorkJun '25 – Dec '25
- Final inspectionJul 28, 2025
Passed final inspection Jul 28, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectEv install
Ev install
City of Austin permitElectrical PermitFinal- Record
- 2025-073884 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4710 Plum Peach Bnd
What is being built at 4710 Plum Peach Bnd?
The latest filing (City of Austin permit 2025-073884 EP, June 17, 2025) covers ev install.
How many permits and filings does 4710 Plum Peach Bnd have?
1 filing across 1 project, from June 17, 2025 to June 17, 2025.
Is there other construction near 4710 Plum Peach Bnd?
Yes. Nearby filings include 4610 Plum Peach Bnd (base: installing a backup battery system and additional meter socket, Aug 13, 2026); 5402 Cobalt Canopy Bnd (replacement of an existing water heater replacement of a gas tankless water heater, Oct 14, 2026); 5401 Mulberry Grove Ln (request to disconnect installation of 200 amp mid on service with existing 200 amp meter to remain, Jun 18, 2025).
How do I get alerts for new permits at 4710 Plum Peach Bnd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 4610 Plum Peach BndAug 13, 2026Base: installing a backup battery system and additional meter socket · 59 m away
- 5402 Cobalt Canopy BndOct 14, 2026Replacement of an existing water heater replacement of a gas tankless water heater · 98 m away
- 5401 Mulberry Grove LnJun 18, 2025Request to disconnect installation of 200 amp mid on service with existing 200 amp meter to remain · 115 m away
- 5307 Cobalt Canopy BndJun 29, 2026Install roof mounted solar - (14) 420w panels - 5.88 kw added (1) tesla powerwall 3 battery · 124 m away
- 5407 Golden Canary LnSep 18, 2026Base: installing a backup battery system and additional meter socket · 127 m away
- 5405 Golden Canary LnJul 21, 2025Install level 2 ev charger · 134 m away
- 5502 Golden Canary LnJun 5, 2024Irrigation · 143 m away
- 5312 Mulberry Grove LnOct 28, 2026Base: installing a backup battery system and additional meter socket · 150 m away
- 5401 Springdale RdSep 18, 2026Little walnut creek greenbelt park · 153 m away
- 4909 Plum Peach BndOct 9, 2024Install new 6.56kw rooftop solar system and 13.5kw energy storage system for existing residential only · 160 m away
- 5305 Basswood LnJul 30, 202510ft foot tunnel on the left side of home standing straight in front with up to 75ft sewer yard line replacement · 228 m away
- 5406 Basswood LnJul 2, 2024Automatic irrigation system using city potable water · 237 m away