5401 Springdale Rd
Austin, TX 78723
Site plan approved for Little Walnut Creek Greenbelt Park
An approved site plan for Little Walnut Creek Greenbelt Park is recorded at 5401 Springdale Road in Austin. The City of Austin case, 13165158, was filed and marked Approved and Released on September 18, 2026.
Summarized from City of Austin records · updated Sep 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 18, 2026
- since Sep 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 5401 Springdale Rd
What is being built at 5401 Springdale Road in Austin?
A City of Austin site plan case identifies the project as Little Walnut Creek Greenbelt Park. The case was marked Approved and Released on September 18, 2026.
Is Little Walnut Creek Greenbelt Park approved?
The City of Austin case for the site plan is marked Approved and Released. It was filed on September 18, 2026.
When was the Little Walnut Creek Greenbelt Park site plan filed?
The City of Austin filed case 13165158 on September 18, 2026.
Where is the Little Walnut Creek Greenbelt Park project?
The project is listed at 5401 Springdale Road, Austin, TX 78723.
What does the city record say about the project at 5401 Springdale Road?
The City of Austin record names it Little Walnut Creek Greenbelt Park and classifies the case as a site plan. Its status is Approved and Released.
Also being built nearby
All of 78723- 5502 Golden Canary LnJun 5, 2024Irrigation · 86 m away
- 4610 Plum Peach BndAug 13, 2026Base: installing a backup battery system and additional meter socket · 98 m away
- 5406 Basswood LnJul 2, 2024Automatic irrigation system using city potable water · 101 m away
- 5521 Springdale RdJun 27, 2024Interior remodel: minor modifications at mail room including new millwork & cabinetry; remodel of conference room at club room to divide into two rooms; add banquette millwork to club room no mechanical work performed no need for permit or inspections · 119 m away
- 3406 Norwood Hill RdApr 21, 2026Upgrade service · 145 m away
- 4710 Plum Peach BndJun 17, 2025Ev install · 153 m away
- 5503 Pendleton LnFeb 13, 2026200-amp overhead service rebuild · 156 m away
- 5407 Golden Canary LnSep 18, 2026Base: installing a backup battery system and additional meter socket · 158 m away
- 5405 Golden Canary LnJul 21, 2025Install level 2 ev charger · 169 m away
- 5305 Basswood LnJul 30, 202510ft foot tunnel on the left side of home standing straight in front with up to 75ft sewer yard line replacement · 175 m away
- 5308 Basswood LnMar 13, 2024Addition addition to increase size of master bed/bath new electrics/plumbing/drywall/windows/flooring install smoke detactors · 179 m away
- 5306 Basswood LnAug 18, 202565 tunnel below the foundation to replace entire drain system. 3 access holes- right back back · 181 m away