The Eddy site-plan cases at 6620 Ed Bluestein Blvd
Austin records list a site-plan project called The Eddy at 6620 Ed Bluestein Blvd, but do not specify what is planned for the site. A related site-plan case, 13490967, was approved and released on February 2, 2026; a later case, 13006051, filed August 17, 2026, is marked expired.
Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated Aug 17, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Aug 17, 2026
- since Feb 10, 2025
- Largest scope
- —
- Estimated cost
- $1.1M
- state registration
Where this project stands
Under constructionThe Eddy
7,500 sq ft · $1.1M est.
- RegisteredJun 12, 2023
- Plan review
- ConstructionJun '25 – Jan '27
- Inspected
- Closed
4 contacts on this project · 2 phone numbers
Permit & project history
4 projectsMultifamily common & leasing office — the eddy
TDLR project registrationNew ConstructionReview Complete7,500 sq ft$1.1M est.- Project #
- TABS2023021241
- Tenant / owner
- The Eddy
- Design firm
- Pro
- Contact
- Pro
Sources: City of Austin · Texas Department of Licensing and Regulation
Questions about 6620 Ed Bluestein Blvd
What is being built at 6620 Ed Bluestein Blvd?
Austin records show site-plan cases for a project named The Eddy. They do not provide details about the planned building or use.
What is The Eddy in Austin?
The Eddy is the name on site-plan cases for 6620 Ed Bluestein Blvd. The records provided do not describe the project’s scope.
Was The Eddy site plan approved?
Case 13490967, a related The Eddy site-plan case, was approved and released on February 2, 2026. A separate case filed August 17, 2026, case 13006051, is marked expired.
When was the site plan for The Eddy filed?
Austin records show The Eddy site-plan cases filed on February 10, 2025, February 2, 2026, and August 17, 2026. The February 2026 case was approved and released; the other two are marked expired.
How large is The Eddy project at 6620 Ed Bluestein Blvd?
The records provided do not list a project square footage or estimated cost for The Eddy.
Also being built nearby
All of 78723- 6617 Greensboro DrSep 30, 2024Replacement of sewer line from house to property line · 78 m away
- 6623 Greensboro DrApr 15, 2026Pennick 39-48486 - disconnect/reconnect power to move rev meter up to minimum required height. we will tie in pv component to existing msp _200__ amps. _200__ main breaker only · 88 m away
- 6615 Greensboro DrJul 15, 2025Install new 14.450 kw rooftop solar system and 13.5kw energy storage system for existing residential only · 90 m away
- 6611 Greensboro DrJun 4, 2026Express: replacing existing windows · 121 m away
- 6610 Greensboro DrNov 16, 2026Replacement of complete existing central heat and air system with or without duct work · 145 m away
- 6629 Greensboro DrJun 1, 2026Replacement of an existing water heater 40gal gas tank · 156 m away
- 6617 Highpoint DrJun 2, 2026Interior remodel- replace windows and doors size for size remove and replace all plumbing valves replace damaged sheetrock throughout new outlets and replace as needed for electrical repairs replace lighting and plumbing fixtures repair damaged sewer line replace cabinets · 174 m away
- 6605 Greensboro DrJun 23, 2025Convert existing 2-car garage into family room; convert a portion of existing front covered porch to conditioned space (expanding new family room) · 188 m away
- 6614 Highpoint DrApr 25, 2025Excavate 45 trench to repair main drain line in yard · 188 m away
- 6602 Greensboro DrJun 27, 2024Tunnel 25-30â from the back of the home bathroom to the middle bathroom -remove and replace all cast iron in the 25-30â run -install new clean out at back bathroom -new piping will be secured with c-clamp hangers connected to the slab with threaded rods -after new piping is installed the system will be placed on test for the city inspector -a structural engineer will inspect the tunnel excavation -excavation crew will return and backfill the tunnel per the engineers recommendations · 202 m away
- 6620 Ed Bluestein Blvd SbSep 6, 2026New construction of multifamily - 3 story residences over 2 story parking - total 5 stories bldgs a b and c [building. b] · 211 m away
- 6609 Highpoint DrFeb 8, 2024Replacement of an existing water heater · 227 m away