5925 Nelson Oaks Dr
Austin, TX 78724
Sewer tunnel and foundation repair permitted at Austin home
City of Austin permits indicate foundation repair at 5925 Nelson Oaks Dr, permitted April 15, 2026. A separate permit dated May 26, 2026, describes a 16-foot tunnel for sewer work to reach a broken pipe in the 3-inch mainline.
Summarized from City of Austin records · updated May 26, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 26, 2026
- since Apr 15, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled16 ft tunnel. the tunnel is for sewer. the tunnel will be located front right side when facing the house by the clean out. tunnel went 3-inch mainline broken pipe
- AppliedMay 22, 2026
- IssuedMay 26, 2026
- WorkMay '26 – Jun '26
- Final inspectionJun 1, 2026
Passed final inspection Jun 1, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projects16 ft tunnel. the tunnel is for sewer. the tunnel will be located front right side when facing the house by the clean out. tunnel went 3-inch mainline broken pipe
16 ft tunnel. the tunnel is for sewer. the tunnel will be located front right side when facing the house by the clean out. tunnel went 3-inch mainline broken pipe
City of Austin permitPlumbing PermitFinal- Record
- 2026-065517 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: foundation repair
Express: foundation repair
City of Austin permitBuilding PermitFinal- Record
- 2026-041694 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5925 Nelson Oaks Dr
What is being built at 5925 Nelson Oaks Dr?
The permits list foundation repair and a 16-foot tunnel for sewer work to reach a broken pipe in the 3-inch mainline. They do not describe a new building.
When were permits filed for 5925 Nelson Oaks Dr?
The foundation repair permit was filed April 15, 2026, and the sewer-tunnel plumbing permit was filed May 26, 2026.
What is the 16-foot tunnel at 5925 Nelson Oaks Dr for?
The May 26, 2026, plumbing permit describes a 16-foot tunnel for sewer work. It says the tunnel will reach a broken pipe in the 3-inch mainline.
Is there a permit for foundation repair at 5925 Nelson Oaks Dr?
Yes. City of Austin building permit 2026-041694 BP, dated April 15, 2026, is for foundation repair.
What does permit 2026-065517 PP cover?
The City of Austin plumbing permit, dated May 26, 2026, covers a 16-foot tunnel for sewer work to reach a broken pipe in the 3-inch mainline.
Also being built nearby
All of 78724- 6000 Nelson Oaks DrJun 24, 2024Main water service from meter to home · 48 m away
- 6005 Nelson Oaks DrMar 26, 2025Express: foundation repair · 54 m away
- 6008 Nelson Oaks DrJun 2, 2026Replacement of complete existing central heat and air system with or without duct work · 66 m away
- 5825 Nelson Oaks DrJun 9, 2026Replacement of complete existing central heat and air system with or without duct work replace 2.5 ton heat pump upflow in closet. single stage. on first floor · 102 m away
- 6009 Elfen WayJul 22, 2026Express- foundation repair · 105 m away
- 5824 Nelson Oaks DrMay 23, 2024Replacement of complete existing central heat and air system with or without duct work · 117 m away
- 5821 Nelson Oaks DrJul 22, 2026Replacement of complete existing central heat and air system with or without duct work · 117 m away
- 5904 Chantsong CtDec 4, 2024Replacement of complete existing central heat and air system with or without duct work · 139 m away
- 6032 Elfen WaySep 5, 2024Replacement of complete existing central heat and air system with or without duct work · 144 m away
- 5813 Nelson Oaks DrSep 25, 2025Express: foundation repair · 147 m away
- 5712 Elk XingJan 19, 2024Replacement of an existing water heater · 150 m away
- 9101 Indigo Sky DrMar 31, 202533 tunnel to repair multiple breaks on the mainline · 154 m away