6032 Elfen Way
Austin, TX 78724
6032 Elfen Way: 1 project on record
City of Austin lists 1 filing across 1 project at 6032 Elfen Way, Austin, TX 78724. The most recent, filed September 5, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Sep 5, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 5, 2024
- since Sep 5, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedAug 29, 2024
- IssuedSep 5, 2024
- WorkSep '24 – Oct '24
- Final inspectionOct 14, 2024
Passed final inspection Oct 14, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-110698 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6032 Elfen Way
What is being built at 6032 Elfen Way?
The latest filing (City of Austin permit 2024-110698 MP, September 5, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 6032 Elfen Way have?
1 filing across 1 project, from September 5, 2024 to September 5, 2024.
What is being built near Mobile Loaves & Fishes, in Austin?
6032 Elfen Way is about 179 m from Mobile Loaves & Fishes, (9116 Hog Eye Rd). Its latest filing is for replacement of complete existing central heat and air system with or without duct work.
Is there other construction near 6032 Elfen Way?
Yes. Nearby filings include 9008 Elfen Cv (replacement of complete existing central heat and air system with or without duct work, Nov 29, 2023); 9012 Elfen Cv (install level 2 ev charger, Oct 22, 2026); 8918 Hog Eye Rd (bayer commercial, Jan 1, 2022).
How do I get alerts for new permits at 6032 Elfen Way?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78724- 9008 Elfen CvNov 29, 2023Replacement of complete existing central heat and air system with or without duct work · 66 m away
- 9012 Elfen CvOct 22, 2026Install level 2 ev charger · 81 m away
- 8918 Hog Eye RdJan 1, 2022Bayer commercial · 83 m away
- 6005 Nelson Oaks DrMar 26, 2025Express: foundation repair · 93 m away
- 6009 Elfen WayJul 22, 2026Express- foundation repair · 94 m away
- 6008 Nelson Oaks DrJun 2, 2026Replacement of complete existing central heat and air system with or without duct work · 123 m away
- 5916 Chantsong CtJul 2, 2025Replacement of complete existing central heat and air system with or without duct work · 141 m away
- 5904 Chantsong CtDec 4, 2024Replacement of complete existing central heat and air system with or without duct work · 142 m away
- 5925 Nelson Oaks DrMay 26, 202616 ft tunnel. the tunnel is for sewer. the tunnel will be located front right side when facing the house by the clean out. tunnel went 3-inch mainline broken pipe · 144 m away
- 6000 Nelson Oaks DrJun 24, 2024Main water service from meter to home · 148 m away
- 9104 Hog Eye RdNov 3, 2026Hog eye multifamily · 152 m away
- 5909 Chantsong CtJan 8, 2025Express: existing foundation repair as per scope of work attached · 175 m away