6008 Nelson Oaks Dr
Austin, TX 78724
Central heating and air system replacement in Austin
A permit covers replacement of the complete existing central heating and air system at 6008 Nelson Oaks Dr, with or without duct work. The City of Austin issued the mechanical permit on June 2, 2026; its status is final.
Summarized from City of Austin records · updated Jun 2, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 2, 2026
- since Jun 2, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedMay 27, 2026
- IssuedJun 2, 2026
- WorkJun '26 – Jun '26
- Final inspectionJun 12, 2026
Passed final inspection Jun 12, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2026-066892 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6008 Nelson Oaks Dr
What is being done at 6008 Nelson Oaks Dr?
A City of Austin mechanical permit covers replacement of the complete existing central heating and air system, with or without duct work.
When was the HVAC permit filed for 6008 Nelson Oaks Dr?
The permit was filed June 2, 2026. Permit number: 2026-066892 MP.
Is new construction planned at 6008 Nelson Oaks Dr?
The available record describes replacement of an existing central heating and air system, not new construction.
What kind of permit was issued for 6008 Nelson Oaks Dr?
The City of Austin issued a mechanical permit, number 2026-066892 MP, on June 2, 2026.
Is the permit for 6008 Nelson Oaks Dr final?
Yes. The City of Austin lists permit 2026-066892 MP as final.
Also being built nearby
All of 78724- 6000 Nelson Oaks DrJun 24, 2024Main water service from meter to home · 32 m away
- 6005 Nelson Oaks DrMar 26, 2025Express: foundation repair · 46 m away
- 5925 Nelson Oaks DrMay 26, 202616 ft tunnel. the tunnel is for sewer. the tunnel will be located front right side when facing the house by the clean out. tunnel went 3-inch mainline broken pipe · 66 m away
- 8918 Hog Eye RdJan 1, 2022Bayer commercial · 109 m away
- 6032 Elfen WaySep 5, 2024Replacement of complete existing central heat and air system with or without duct work · 123 m away
- 6009 Elfen WayJul 22, 2026Express- foundation repair · 132 m away
- 5825 Nelson Oaks DrJun 9, 2026Replacement of complete existing central heat and air system with or without duct work replace 2.5 ton heat pump upflow in closet. single stage. on first floor · 164 m away
- 5824 Nelson Oaks DrMay 23, 2024Replacement of complete existing central heat and air system with or without duct work · 171 m away
- 5904 Chantsong CtDec 4, 2024Replacement of complete existing central heat and air system with or without duct work · 180 m away
- 5821 Nelson Oaks DrJul 22, 2026Replacement of complete existing central heat and air system with or without duct work · 180 m away
- 9008 Elfen CvNov 29, 2023Replacement of complete existing central heat and air system with or without duct work · 183 m away
- 9012 Elfen CvOct 22, 2026Install level 2 ev charger · 198 m away