6020 Sendero Hills Pkwy
Austin, TX 78724
6020 Sendero Hills Pkwy: 1 project on record
City of Austin lists 1 filing across 1 project at 6020 Sendero Hills Pkwy, Austin, TX 78724. The most recent, filed January 19, 2024, covers: “New irrigation system”.
Compiled from City of Austin records · updated Jan 19, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 19, 2024
- since Jan 19, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledNew irrigation system
- AppliedJan 16, 2024
- IssuedJan 19, 2024
- WorkJan '24 – Feb '24
- Final inspectionFeb 9, 2024
Passed final inspection Feb 9, 2024.
Permit & project history
1 projectNew irrigation system
New irrigation system
City of Austin permitPlumbing PermitFinal- Record
- 2024-005254 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6020 Sendero Hills Pkwy
What is being built at 6020 Sendero Hills Pkwy?
The latest filing (City of Austin permit 2024-005254 PP, January 19, 2024) covers new irrigation system.
How many permits and filings does 6020 Sendero Hills Pkwy have?
1 filing across 1 project, from January 19, 2024 to January 19, 2024.
Is there other construction near 6020 Sendero Hills Pkwy?
Yes. Nearby filings include 6016 Sendero Hills Pkwy (base: installing a backup battery system and additional meter socket, Sep 22, 2026); 6012 Sendero Hills Pkwy (building an in-ground pool with new concrete deck spa and gas fire pit, Sep 13, 2024); 6041 Signal Pt (like for like. construct new driveway approach of 10.5 ft. driveway approach is from the alley, Feb 6, 2025).
How do I get alerts for new permits at 6020 Sendero Hills Pkwy?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78724- 6016 Sendero Hills PkwySep 22, 2026Base: installing a backup battery system and additional meter socket · 18 m away
- 6012 Sendero Hills PkwySep 13, 2024Building an in-ground pool with new concrete deck spa and gas fire pit · 35 m away
- 6041 Signal PtFeb 6, 2025Like for like. construct new driveway approach of 10.5 ft. driveway approach is from the alley · 81 m away
- 6000 Sendero Hills PkwyJul 24, 2020Sendero hills phase 5 amended plat (with r c8-2019-0165.0a) · 82 m away
- 6036 Pinon Vista DrApr 1, 2025Replacement of an existing water heater 50 gallon natural gas water heater · 89 m away
- 6008 Perlita DrJun 11, 2025Replacement of complete existing central heat and air system with or without duct work · 101 m away
- 6028 Pinon Vista DrMay 24, 2024Replacement of complete existing central heat and air system with or without duct work · 104 m away
- 6012 Perlita DrJul 14, 2025Replacement of complete existing central heat and air system with or without duct work · 107 m away
- 6036 Signal PtApr 25, 2025Express: foundation repair · 127 m away
- 6021 Signal PtOct 7, 2025Replacement of complete existing central heat and air system with or without duct work replace a 3 ton gas system · 132 m away
- 6001 Perlita DrJul 22, 2024(lane mark) - installation of circuit for elec. vehicle charging station - esip · 137 m away
- 6028 Signal PtJun 22, 2026Express: re-roofing (located in wui) · 138 m away