4501 Dunlap Rd
Austin, TX 78725
4501 Dunlap Rd: 2 projects on record
City of Austin lists 2 filings across 2 projects at 4501 Dunlap Rd, Austin, TX 78725 since February 3, 2010. The most recent, filed March 11, 2013, covers: “Txi hornsby bend east”.
Compiled from City of Austin records · updated Mar 11, 2013
- Projects
- 2
- 2 filings
- Latest filing
- Mar 11, 2013
- since Feb 3, 2010
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 4501 Dunlap Rd
What is being built at 4501 Dunlap Rd?
The latest filing (City of Austin case 10835399, March 11, 2013) covers txi hornsby bend east.
How many permits and filings does 4501 Dunlap Rd have?
2 filings across 2 projects, from February 3, 2010 to March 11, 2013.
Is there other construction near 4501 Dunlap Rd?
Yes. Nearby filings include 910-1/2 Dunlap Rd (txi hornsby bend west site plan revision, Mar 11, 2013); 4517 Secure Ln (to install an ev charger at the same time as a solar system ev charger will be fed from solar, Jan 16, 2026); 4524 Felicity Ln (197amp replacement. no meter work being done. austin electric is the provider, Jul 1, 2026).
How do I get alerts for new permits at 4501 Dunlap Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78725- 910-1/2 Dunlap RdMar 11, 2013Txi hornsby bend west site plan revision · 215 m away
- 4517 Secure LnJan 16, 2026To install an ev charger at the same time as a solar system ev charger will be fed from solar · 230 m away
- 4524 Felicity LnJul 1, 2026197amp replacement. no meter work being done. austin electric is the provider · 232 m away
- 4600 Dunlap RdFeb 2, 2010Chaparral crossing · 291 m away
- 4506 Best WayOct 3, 2025Replace modular meter bank with new meter bank - modular meter bank has 6 meters for it. revised 9/30/25 sm - 600 amp main disconnect serving mme of (6) meters with (6) 100 amp disconnects. ec states ae required a 600 amp disconnect before the meters. only 1 set of 350 al existing underground for the service? units 4500 4502 4504 and 4510 to be energized. unit 4506 will need new feeders from the 100 amp breaker to the house. unit 4508 will need a new neutral pulled from the meter bank to the house. will be different permits as the hoa is not responsible for feeders. all homes are occupied · 313 m away
- 4521 Credo LnOct 15, 2026Etj ec is replacing the existing mcb in an existing meter pack with a larger breaker. inspection stops at the mcb · 375 m away
- 4512 Credo LnApr 25, 2025Install new 6.090 dc kw rooftop solar system for existing residential only · 401 m away
- 4626 Best WayMar 5, 2026Replacement of an existing water heater remove and replace water heater - 40 gal electric · 472 m away