910-1/2 Dunlap Rd
Austin, TX 78725
910-1/2 Dunlap Rd: 2 projects on record
City of Austin lists 2 filings across 2 projects at 910-1/2 Dunlap Rd, Austin, TX 78725 since October 8, 2012. The most recent, filed March 11, 2013, covers: “Txi hornsby bend west site plan revision”.
Compiled from City of Austin records · updated Mar 11, 2013
- Projects
- 2
- 2 filings
- Latest filing
- Mar 11, 2013
- since Oct 8, 2012
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 910-1/2 Dunlap Rd
What is being built at 910-1/2 Dunlap Rd?
The latest filing (City of Austin case 10835346, March 11, 2013) covers txi hornsby bend west site plan revision.
How many permits and filings does 910-1/2 Dunlap Rd have?
2 filings across 2 projects, from October 8, 2012 to March 11, 2013.
Is there other construction near 910-1/2 Dunlap Rd?
Yes. Nearby filings include 4501 Dunlap Rd (txi hornsby bend east, Mar 11, 2013); 4517 Secure Ln (to install an ev charger at the same time as a solar system ev charger will be fed from solar, Jan 16, 2026); 4506 Best Way (replace modular meter bank with new meter bank - modular meter bank has 6 meters for it. revised 9/30/25 sm - 600 amp main disconnect serving mme of (6) meters with (6) 100 amp disconnects. ec states ae required a 600 amp disconnect before the meters. only 1 set of 350 al existing underground for the service? units 4500 4502 4504 and 4510 to be energized. unit 4506 will need new feeders from the 100 amp breaker to the house. unit 4508 will need a new neutral pulled from the meter bank to the house. will be different permits as the hoa is not responsible for feeders. all homes are occupied, Oct 3, 2025).
How do I get alerts for new permits at 910-1/2 Dunlap Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78725- 4501 Dunlap RdMar 11, 2013Txi hornsby bend east · 215 m away
- 4517 Secure LnJan 16, 2026To install an ev charger at the same time as a solar system ev charger will be fed from solar · 374 m away
- 4506 Best WayOct 3, 2025Replace modular meter bank with new meter bank - modular meter bank has 6 meters for it. revised 9/30/25 sm - 600 amp main disconnect serving mme of (6) meters with (6) 100 amp disconnects. ec states ae required a 600 amp disconnect before the meters. only 1 set of 350 al existing underground for the service? units 4500 4502 4504 and 4510 to be energized. unit 4506 will need new feeders from the 100 amp breaker to the house. unit 4508 will need a new neutral pulled from the meter bank to the house. will be different permits as the hoa is not responsible for feeders. all homes are occupied · 381 m away
- 4524 Felicity LnJul 1, 2026197amp replacement. no meter work being done. austin electric is the provider · 400 m away
- 4512 Credo LnApr 25, 2025Install new 6.090 dc kw rooftop solar system for existing residential only · 463 m away
- 4521 Credo LnOct 15, 2026Etj ec is replacing the existing mcb in an existing meter pack with a larger breaker. inspection stops at the mcb · 465 m away
- 4600 Dunlap RdFeb 2, 2010Chaparral crossing · 484 m away