groundranger
Recent · latest filing Sep 2025Residential

7504 Shelton Rd

Austin, TX 78725

7504 Shelton Rd: 1 project on record

City of Austin lists 1 filing across 1 project at 7504 Shelton Rd, Austin, TX 78725. The most recent, filed September 23, 2025, covers: “Per tx gas they need to repair a leak on there end and while gas is off we need to relocate the gas meter away from door waywindows and crawl space vents”.

Compiled from City of Austin records · updated Sep 23, 2025

Projects
1
1 filings
Latest filing
Sep 23, 2025
since Sep 23, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Per tx gas they need to repair a leak on there end and while gas is off we need to relocate the gas meter away from door waywindows and crawl space vents

  1. AppliedSep 23, 2025
  2. IssuedSep 23, 2025
  3. WorkSep '25 – Sep '25
  4. Final inspectionSep 25, 2025

Passed final inspection Sep 25, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Per tx gas they need to repair a leak on there end and while gas is off we need to relocate the gas meter away from door waywindows and crawl space vents

    Per tx gas they need to repair a leak on there end and while gas is off we need to relocate the gas meter away from door waywindows and crawl space vents

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 7504 Shelton Rd

What is being built at 7504 Shelton Rd?

The latest filing (City of Austin permit 2025-121051 PP, September 23, 2025) covers per tx gas they need to repair a leak on there end and while gas is off we need to relocate the gas meter away from door waywindows and crawl space vents.

How many permits and filings does 7504 Shelton Rd have?

1 filing across 1 project, from September 23, 2025 to September 23, 2025.

Is there other construction near 7504 Shelton Rd?

Yes. Nearby filings include 7615-1/2 Shelton Rd (secondary colorado river raw water line (city of pflugerville), Nov 8, 2024); 7691 Delwau Ln (connect power to existing sturcture, Jun 18, 2025); 7701 Shelton Rd (pflugerville secondary colorado river raw water pump station expansion, Dec 19, 2025).

How do I get alerts for new permits at 7504 Shelton Rd?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78725
Email me when a new permit is filed