7615-1/2 Shelton Rd
Austin, TX 78725
Pflugerville raw water line site plan approved on Shelton Road
An approved site plan covers a secondary Colorado River raw water line for the City of Pflugerville at 7615-1/2 Shelton Road. The City of Austin case was approved and released on November 8, 2024 (case 13118088).
Summarized from City of Austin records · updated Nov 8, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 8, 2024
- since Nov 8, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 7615-1/2 Shelton Rd
What is being built at 7615-1/2 Shelton Road in Austin?
A City of Austin site plan case covers a secondary Colorado River raw water line for the City of Pflugerville. The case was approved and released on November 8, 2024.
What is case 13118088 on Shelton Road?
It is the City of Austin case for the Secondary Colorado River Raw Water Line (City of Pflugerville). The site plan was approved and released on November 8, 2024.
Is a new building planned at 7615-1/2 Shelton Road?
The available record is for a site plan for a secondary raw water line, not a building project.
Who is the raw water line project for?
The site plan names the City of Pflugerville as the project owner.
When was the Shelton Road raw water line case approved?
The City of Austin case was approved and released on November 8, 2024.
Also being built nearby
All of 78725- 7701 Shelton RdDec 19, 2025Pflugerville secondary colorado river raw water pump station expansion · 55 m away
- 7703 Shelton RdFeb 24, 2026Austin energy controlled power outage for safety purposes only. tmc will be installing new equipment inside the existing water pump station and in order to complete this work in a safe and controlled environment the facility must be temporarily de-energized. please note that no work will be performed on the existing austin energy service. all work will be limited to equipment located within the water pump station we will be removing the existing 2500a switchboard and installing a new switchboard with the same amperage rating · 72 m away
- 7705 Shelton RdMar 20, 2026Water heater b vent repair and furnace flue pipe now has a 1 clearance · 88 m away
- 7504 Shelton RdSep 23, 2025Per tx gas they need to repair a leak on there end and while gas is off we need to relocate the gas meter away from door waywindows and crawl space vents · 147 m away
- 7691 Delwau LnJun 18, 2025Connect power to existing sturcture · 153 m away
- 7651 Delwau LnFeb 12, 2025Installation of irrigation at a 1 meter. 2024 144567 w · 173 m away
- 7709 Delwau LnJun 15, 2009Delwau acres subdivision · 205 m away
- 7715 Delwau LnJun 19, 2017Kylee addition · 259 m away
- 2720 Lane City DrSep 11, 2026Express: tub to shower conversion · 457 m away
- 2713 Cottonwood Shores DrMay 28, 2024Deinstall/reinstall of existing solar system. ae. no changes being made · 492 m away
- 2701 Cottonwood Shores DrJul 9, 2025Replacement of complete existing central heat and air system with or without duct work hvac system replacement · 509 m away
- 2605 Cottonwood Shores DrJun 5, 2024Install a full lawn sprinkler system · 513 m away