7703 Shelton Rd
Austin, TX 78725
Switchboard replacement permitted at existing water pump station
A City of Austin permit filed February 24, 2026, covers equipment work inside the existing water pump station at 7703 Shelton Rd. The work includes replacing a 2,500-amp switchboard with one of the same amperage rating; the permit says the facility must be temporarily de-energized for safety.
Summarized from City of Austin records · updated Feb 24, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Feb 24, 2026
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayAustin energy controlled power outage for safety purposes only. tmc will be installing new equipment inside the existing water pump station and in order to complete this work in a safe and controlled environment the facility must be temporarily de-energized. please note that no work will be performed on the existing austin energy service. all work will be limited to equipment located within the water pump station we will be removing the existing 2500a switchboard and installing a new switchboard with the same amperage rating
- AppliedFeb 13, 2026
- IssuedFeb 24, 2026
- WorkFeb '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
3 projectsAustin energy controlled power outage for safety purposes only. tmc will be installing new equipment inside the existing water pump station and in order to complete this work in a safe and controlled environment the facility must be temporarily de-energized. please note that no work will be performed on the existing austin energy service. all work will be limited to equipment located within the water pump station we will be removing the existing 2500a switchboard and installing a new switchboard with the same amperage rating
Austin energy controlled power outage for safety purposes only. tmc will be installing new equipment inside the existing water pump station and in order to complete this work in a safe and controlled environment the facility must be temporarily de-energized. please note that no work will be performed on the existing austin energy service. all work will be limited to equipment located within the water pump station we will be removing the existing 2500a switchboard and installing a new switchboard with the same amperage rating
City of Austin permitElectrical PermitActive- Record
- 2026-017700 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Disconnect the service to perform an insulation resistance test on the existing conductors between the utility transformer and the switchboard. etj
Disconnect the service to perform an insulation resistance test on the existing conductors between the utility transformer and the switchboard. etj
City of Austin permitElectrical PermitFinal- Record
- 2025-059145 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7703 Shelton Rd
What is being built at 7703 Shelton Rd?
The February 2026 permit describes equipment work inside an existing water pump station, including replacement of its switchboard. It does not describe a new building.
When was work permitted at 7703 Shelton Rd?
The latest permit was filed February 24, 2026. It is City of Austin electrical permit 2026-017700 EP.
Is a new water pump station being built at 7703 Shelton Rd?
The permit describes work inside an existing water pump station, not construction of a new station.
What equipment is being replaced at the water pump station?
Permit 2026-017700 EP describes removing the existing 2,500-amp switchboard and installing a new switchboard with the same amperage rating.
Will the water pump station be temporarily shut down?
The permit says the facility must be temporarily de-energized to complete the work in a safe, controlled environment. It does not describe a longer-term closure.
What earlier project was approved at 7703 Shelton Rd?
A City of Austin case for the City of Pflugerville's Colorado River Water Supply Project, Contract No. 4, was approved and released on March 2, 2007.
Also being built nearby
All of 78725- 7705 Shelton RdMar 20, 2026Water heater b vent repair and furnace flue pipe now has a 1 clearance · 16 m away
- 7701 Shelton RdDec 19, 2025Pflugerville secondary colorado river raw water pump station expansion · 23 m away
- 7615-1/2 Shelton RdNov 8, 2024Secondary colorado river raw water line (city of pflugerville) · 72 m away
- 7691 Delwau LnJun 18, 2025Connect power to existing sturcture · 149 m away
- 7709 Delwau LnJun 15, 2009Delwau acres subdivision · 168 m away
- 7651 Delwau LnFeb 12, 2025Installation of irrigation at a 1 meter. 2024 144567 w · 174 m away
- 7715 Delwau LnJun 19, 2017Kylee addition · 191 m away
- 7504 Shelton RdSep 23, 2025Per tx gas they need to repair a leak on there end and while gas is off we need to relocate the gas meter away from door waywindows and crawl space vents · 215 m away
- 2720 Lane City DrSep 11, 2026Express: tub to shower conversion · 528 m away
- 2713 Cottonwood Shores DrMay 28, 2024Deinstall/reinstall of existing solar system. ae. no changes being made · 562 m away
- 2701 Cottonwood Shores DrJul 9, 2025Replacement of complete existing central heat and air system with or without duct work hvac system replacement · 580 m away
- 2605 Cottonwood Shores DrJun 5, 2024Install a full lawn sprinkler system · 585 m away