5770 Mopac Expy Svrd
Austin, TX 78731
5770 Mopac Expy Svrd: 1 project on record
City of Austin lists 1 filing across 1 project at 5770 Mopac Expy Svrd, Austin, TX 78731. The most recent, filed March 2, 2007, covers: “Zuzu's restaurant”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 1
- 1 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 5770 Mopac Expy Svrd
What is being built at 5770 Mopac Expy Svrd?
The latest filing (City of Austin case 181711, March 2, 2007) covers zuzu's restaurant.
How many permits and filings does 5770 Mopac Expy Svrd have?
1 filing across 1 project, from March 2, 2007 to March 2, 2007.
What is being built near Frost Financial Center in Austin?
5770 Mopac Expy Svrd is about 54 m from Frost Financial Center (5800 N Mo-Pac Expressway). Its latest filing is for zuzu's restaurant.
Is there other construction near 5770 Mopac Expy Svrd?
Yes. Nearby filings include 5770 N Mopac Expy Svrd Sb (channel letters on raceways, May 29, 2025); 5800 N Mo-Pac Expressway (frost financial center - northwest hills — renovation/alteration — interior improvement of the second floor of the financial center, Oct 12, 2026); 5707 Trailridge Dr (excavate 60 trench to repair main drain in yard, Jul 11, 2025).
How do I get alerts for new permits at 5770 Mopac Expy Svrd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 5770 N Mopac Expy Svrd SbMay 29, 2025Channel letters on raceways
- 5800 N Mo-Pac Expressway · Frost Financial CenterOct 12, 2026Frost financial center - northwest hills — renovation/alteration — interior improvement of the second floor of the financial center · 54 m away
- 5707 Trailridge DrJul 11, 2025Excavate 60 trench to repair main drain in yard · 119 m away
- 5750 Balcones DrOct 30, 2024Replacement of complete existing central heat and air system with or without duct work · 122 m away
- 5801 Trailridge CirNov 16, 2026Replacement of complete existing central heat and air system with or without duct work · 126 m away
- 5711 Trailridge DrJun 27, 2025Re pipe sewer system under home and also the sewer line to the street. a tunnel of approximately 40 feet from the corner of the home to the city cleanout will be excavated. another 90 foot tunnel will be excavated under the slab to access underneath the home · 128 m away
- 5818 Balcones DrNov 6, 2026Remove existing roof and components replace tpo roof and components. no structural framing building footprint change or change to drain locations. existing office building · 142 m away
- 5701 Trailridge DrApr 21, 2026Service only rebuild. 200a · 158 m away
- 5706 Trailridge DrMar 18, 2024Interior remodel of existing sfr · 168 m away
- 5704 Trailridge DrOct 8, 2026Replacing the homes under-slab drain lines installing a new pex water distribution system and replacing the sewer line from the home to the city connection · 173 m away
- 5702 Trailridge DrApr 9, 2025Replace sewer line · 183 m away
- 5700 Trailridge DrDec 2, 202555 tunnel below the foundation to replace entire drain system. 2 access holes - front right · 190 m away
More restaurants in 78731.