5800 N Mo-Pac Expressway
Austin, TX 78757 · Frost Financial Center
Frost Financial Center second-floor renovation in Austin
A 6,900-square-foot interior renovation is planned for the second floor of Frost Financial Center - Northwest Hills at 5800 N Mo-Pac Expressway. The project was registered with the Texas Department of Licensing and Regulation on October 12, 2026. The applicant estimates the project cost at $3.5 million.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 12, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 12, 2026
- since Oct 12, 2026
- Largest scope
- 6,900 sf
- Estimated cost
- $3.5M
- state registration
Where this project stands
Approved · construction starts Jan 4, 2027Frost Financial Center - Northwest Hills
6,900 sq ft · $3.5M est.
- RegisteredOct 12, 2026
- Plan review
- ConstructionJan '27 – Apr '27
- Inspected
- Closed
A 3-month build is scheduled. Bids for subcontractors and suppliers usually close before the start date.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInterior improvement of the second floor of the financial center. — frost financial center
TDLR project registrationRenovation/AlterationReview Complete6,900 sq ft$3.5M est.- Project #
- TABS2027003346
- Tenant / owner
- Frost Financial Center - Northwest Hills
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 5800 N Mo-Pac Expressway
What is being built at 5800 N Mo-Pac Expressway?
A 6,900-square-foot interior improvement of the second floor at Frost Financial Center - Northwest Hills is registered at this address. The TDLR project registration is TABS2027003346.
When was the Frost Financial Center renovation registered?
The project was registered on October 12, 2026. Its TDLR status is listed as Review Complete.
How much will the Frost Financial Center renovation cost?
The applicant’s estimated cost for the project is $3.5 million.
How large is the renovation at Frost Financial Center - Northwest Hills?
The project registration lists 6,900 square feet of interior improvements on the financial center’s second floor.
Is a new business opening at 5800 N Mo-Pac Expressway?
The record describes an interior renovation of the financial center’s second floor. It does not identify a new business opening.
What is being renovated near Austin Center For Endodontics?
Frost Financial Center - Northwest Hills is registered for a second-floor interior renovation at 5800 N Mo-Pac Expressway, about 244 meters from Austin Center For Endodontics at 3301 Northland Drive.
Also being built nearby
All of 78757- 5770 Mopac Expy SvrdMar 2, 2007Zuzu's restaurant · 54 m away
- 5770 N Mopac Expy Svrd SbMay 29, 2025Channel letters on raceways · 54 m away
- 5750 Balcones DrOct 30, 2024Replacement of complete existing central heat and air system with or without duct work · 146 m away
- 5707 Trailridge DrJul 11, 2025Excavate 60 trench to repair main drain in yard · 170 m away
- 5801 Trailridge CirNov 16, 2026Replacement of complete existing central heat and air system with or without duct work · 177 m away
- 5904 Marilyn DrJun 5, 2026Install level 2 ev charger · 179 m away
- 5902 Marilyn DrMay 14, 202595 tunnel below the foundation to replace entire cast-iron drain system. 3-4 access holes - front left 2 in back · 180 m away
- 5711 Trailridge DrJun 27, 2025Re pipe sewer system under home and also the sewer line to the street. a tunnel of approximately 40 feet from the corner of the home to the city cleanout will be excavated. another 90 foot tunnel will be excavated under the slab to access underneath the home · 182 m away
- 5818 Balcones DrNov 6, 2026Remove existing roof and components replace tpo roof and components. no structural framing building footprint change or change to drain locations. existing office building · 182 m away
- 5701 Trailridge DrApr 21, 2026Service only rebuild. 200a · 196 m away
- 3324 Northland DrApr 25, 2024Interior remodel to an existing convenience store · 203 m away
- 3310 Northland DrFeb 21, 2024Replacement of two rtus air system with or without duct work · 204 m away