5904 Marilyn Dr
Austin, TX 78757
EV charger and HVAC replacement permitted at 5904 Marilyn Dr
Permits indicate a Level 2 EV charger installation and replacement of the existing central heating and air system at 5904 Marilyn Dr. The HVAC permit, 2026-057045 MP, was filed May 8, 2026, and the electrical permit, 2026-069433 EP, was filed June 5, 2026; both are listed as final.
Summarized from City of Austin records · updated Jun 5, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jun 5, 2026
- since May 8, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall level 2 ev charger
- AppliedJun 2, 2026
- IssuedJun 5, 2026
- WorkJun '26 – Dec '26
- Final inspectionJun 9, 2026
Passed final inspection Jun 9, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2026-069433 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work like for like: 3.5 ton vertical gas system
Replacement of complete existing central heat and air system with or without duct work like for like: 3.5 ton vertical gas system
City of Austin permitMechanical PermitFinal- Record
- 2026-057045 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5904 Marilyn Dr
What is being built at 5904 Marilyn Dr in Austin?
City of Austin permits indicate installation of a Level 2 EV charger and replacement of the existing central heating and air system. They do not describe a new building.
Was an EV charger permitted at 5904 Marilyn Dr?
Yes. Electrical permit 2026-069433 EP for a Level 2 EV charger was filed June 5, 2026, and is listed as final.
Is the HVAC system being replaced at 5904 Marilyn Dr?
Yes. Mechanical permit 2026-057045 MP, filed May 8, 2026, covers like-for-like replacement of the existing central heat and air system with a 3.5-ton vertical gas system.
When were permits filed for work at 5904 Marilyn Dr?
The HVAC permit was filed May 8, 2026, and the Level 2 EV charger permit was filed June 5, 2026. Both are listed as final.
What permits were issued for 5904 Marilyn Dr, Austin, TX 78757?
The records list mechanical permit 2026-057045 MP for HVAC replacement and electrical permit 2026-069433 EP for a Level 2 EV charger. Both are City of Austin permits listed as final.
What work is permitted near Frost Financial Center in Austin?
At 5904 Marilyn Dr, about 179 meters from Frost Financial Center, permits indicate HVAC replacement and installation of a Level 2 EV charger. The permits were filed May 8 and June 5, 2026.
Also being built nearby
All of 78757- 5902 Marilyn DrMay 14, 202595 tunnel below the foundation to replace entire cast-iron drain system. 3-4 access holes - front left 2 in back · 25 m away
- 5903 Marilyn DrJan 13, 2025Replacement of complete existing central heat and air system with or without duct work · 55 m away
- 5905 Marilyn DrAug 7, 2026Base: installing a backup battery system and additional meter socket · 65 m away
- 5907 Marilyn DrSep 24, 2026Addition and remodel remodel of kitchen and living spaces and adding a master suite pool bathroom and new roof · 84 m away
- 5901 Fairlane DrOct 27, 2026New construction 2-unit use duplex; unit b: 2-story 1 bedroom 1 bath with covered front porch and interior stairs leading to 2nd floor · 85 m away
- 5912 Marilyn DrMay 11, 2026We will be excavating a 55ft tunnel to make repairs to the drain lines · 97 m away
- 5905 Fairlane DrJan 4, 2024Cap off w and ww · 131 m away
- 5810 Marilyn DrFeb 18, 2025Addition & remodel of 1 story residence: remodel of two adjacent bathrooms kitchen/living area and 2 out of 4 bedrooms. addition of rear covered porch · 132 m away
- 5906 Fairlane DrSep 7, 2026Base: installing a backup battery system and additional meter socket · 134 m away
- 6000 Marilyn DrNov 6, 2025Install new 7.65 kw dc rooftop solar system to existing residential · 146 m away
- 5920 Carleen DrJul 29, 2025Replace the cast iron piping by tunneling 90 feet through the kitchen laundry and bathroom using sch 40 pvc. one access hole by the kitchen one access hole by the bathroom. no sheetrock removal · 152 m away
- 5921 Carleen DrSep 7, 2026Base: installing a backup battery system and additional meter socket · 158 m away