5903 Marilyn Dr
Austin, TX 78757
5903 Marilyn Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 5903 Marilyn Dr, Austin, TX 78757. The most recent, filed January 13, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jan 13, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 13, 2025
- since Jan 13, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of complete existing central heat and air system with or without duct work
- AppliedJul 18, 2022
- IssuedJan 13, 2025
- !WorkJan '25 – Jan '26
- Final inspection
Marked expired Jan 9, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitExpired- Record
- 2022-107306 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5903 Marilyn Dr
What is being built at 5903 Marilyn Dr?
The latest filing (City of Austin permit 2022-107306 MP, January 13, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 5903 Marilyn Dr have?
1 filing across 1 project, from January 13, 2025 to January 13, 2025.
Is there other construction near 5903 Marilyn Dr?
Yes. Nearby filings include 5905 Marilyn Dr (base: installing a backup battery system and additional meter socket, Aug 7, 2026); 5907 Marilyn Dr (addition and remodel remodel of kitchen and living spaces and adding a master suite pool bathroom and new roof, Sep 24, 2026); 5904 Marilyn Dr (install level 2 ev charger, Jun 5, 2026).
How do I get alerts for new permits at 5903 Marilyn Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 5905 Marilyn DrAug 7, 2026Base: installing a backup battery system and additional meter socket · 24 m away
- 5907 Marilyn DrSep 24, 2026Addition and remodel remodel of kitchen and living spaces and adding a master suite pool bathroom and new roof · 49 m away
- 5904 Marilyn DrJun 5, 2026Install level 2 ev charger · 55 m away
- 5902 Marilyn DrMay 14, 202595 tunnel below the foundation to replace entire cast-iron drain system. 3-4 access holes - front left 2 in back · 62 m away
- 5901 Fairlane DrOct 27, 2026New construction 2-unit use duplex; unit b: 2-story 1 bedroom 1 bath with covered front porch and interior stairs leading to 2nd floor · 63 m away
- 5905 Fairlane DrJan 4, 2024Cap off w and ww · 76 m away
- 5906 Fairlane DrSep 7, 2026Base: installing a backup battery system and additional meter socket · 79 m away
- 5912 Marilyn DrMay 11, 2026We will be excavating a 55ft tunnel to make repairs to the drain lines · 91 m away
- 5921 Carleen DrSep 7, 2026Base: installing a backup battery system and additional meter socket · 104 m away
- 5920 Carleen DrJul 29, 2025Replace the cast iron piping by tunneling 90 feet through the kitchen laundry and bathroom using sch 40 pvc. one access hole by the kitchen one access hole by the bathroom. no sheetrock removal · 105 m away
- 5908 Fairlane DrJun 20, 2024Replacing 27 feet of cast iron sewer line as well as cast iron branch lines under two restrooms · 107 m away
- 5909 Fairlane DrOct 9, 2026Base: installing a backup battery system and additional meter socket · 120 m away