Backup battery system planned for 5905 Marilyn Dr
A backup battery system and an additional meter socket are being installed at 5905 Marilyn Dr. The City of Austin electrical permit was filed on August 7, 2026, and is listed as final.
Summarized from City of Austin records · updated Aug 7, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 7, 2026
- since Aug 7, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledBase: installing a backup battery system and additional meter socket
- AppliedAug 3, 2026
- IssuedAug 7, 2026
- WorkAug '26 – Oct '26
- Final inspectionOct 1, 2026
Passed final inspection Oct 1, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectBase: installing a backup battery system and additional meter socket
Base: installing a backup battery system and additional meter socket
City of Austin permitElectrical PermitFinal- Record
- 2026-100316 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5905 Marilyn Dr
What is being built at 5905 Marilyn Dr in Austin?
A City of Austin electrical permit indicates installation of a backup battery system and an additional meter socket. The permit was filed on August 7, 2026.
What does permit 2026-100316 EP cover?
Permit 2026-100316 EP covers installing a backup battery system and an additional meter socket at 5905 Marilyn Dr.
When was the permit for 5905 Marilyn Dr filed?
The City of Austin filed electrical permit 2026-100316 EP on August 7, 2026.
Is the 5905 Marilyn Dr permit approved?
The City of Austin record lists permit 2026-100316 EP as final.
Is a new house being built at 5905 Marilyn Dr?
The available permit describes electrical work for a backup battery system and an additional meter socket. It does not describe new home construction.
Also being built nearby
All of 78757- 5903 Marilyn DrJan 13, 2025Replacement of complete existing central heat and air system with or without duct work · 24 m away
- 5907 Marilyn DrSep 24, 2026Addition and remodel remodel of kitchen and living spaces and adding a master suite pool bathroom and new roof · 25 m away
- 5904 Marilyn DrJun 5, 2026Install level 2 ev charger · 65 m away
- 5912 Marilyn DrMay 11, 2026We will be excavating a 55ft tunnel to make repairs to the drain lines · 71 m away
- 5906 Fairlane DrSep 7, 2026Base: installing a backup battery system and additional meter socket · 75 m away
- 5905 Fairlane DrJan 4, 2024Cap off w and ww · 78 m away
- 5902 Marilyn DrMay 14, 202595 tunnel below the foundation to replace entire cast-iron drain system. 3-4 access holes - front left 2 in back · 79 m away
- 5901 Fairlane DrOct 27, 2026New construction 2-unit use duplex; unit b: 2-story 1 bedroom 1 bath with covered front porch and interior stairs leading to 2nd floor · 86 m away
- 5908 Fairlane DrJun 20, 2024Replacing 27 feet of cast iron sewer line as well as cast iron branch lines under two restrooms · 99 m away
- 5921 Carleen DrSep 7, 2026Base: installing a backup battery system and additional meter socket · 105 m away
- 6000 Marilyn DrNov 6, 2025Install new 7.65 kw dc rooftop solar system to existing residential · 112 m away
- 6001 Marilyn DrJan 27, 2025Express: same-size door replacement from sliding to prehung · 113 m away