groundranger
Historic · latest filing May 2025Residential

5902 Marilyn Dr

Austin, TX 78757

5902 Marilyn Dr: 2 projects on record

City of Austin lists 2 filings across 2 projects at 5902 Marilyn Dr, Austin, TX 78757. The most recent, filed May 14, 2025, covers: “95 tunnel below the foundation to replace entire cast-iron drain system. 3-4 access holes - front left 2 in back”.

Compiled from City of Austin records · updated May 14, 2025

Projects
2
2 filings
Latest filing
May 14, 2025
since May 14, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

95 tunnel below the foundation to replace entire cast-iron drain system. 3-4 access holes - front left 2 in back

  1. AppliedApr 18, 2025
  2. IssuedMay 14, 2025
  3. WorkMay '25 – May '25
  4. Final inspectionMay 30, 2025

Passed final inspection May 30, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. 95 tunnel below the foundation to replace entire cast-iron drain system. 3-4 access holes - front left 2 in back

    95 tunnel below the foundation to replace entire cast-iron drain system. 3-4 access holes - front left 2 in back

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Storm damage - tree limb fell on service entry wire. need to repair riser

    Storm damage - tree limb fell on service entry wire. need to repair riser

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5902 Marilyn Dr

What is being built at 5902 Marilyn Dr?

The latest filing (City of Austin permit 2025-047520 PP, May 14, 2025) covers 95 tunnel below the foundation to replace entire cast-iron drain system. 3-4 access holes - front left 2 in back.

How many permits and filings does 5902 Marilyn Dr have?

2 filings across 2 projects, from May 14, 2025 to May 14, 2025.

Is there other construction near 5902 Marilyn Dr?

Yes. Nearby filings include 5904 Marilyn Dr (install level 2 ev charger, Jun 5, 2026); 5903 Marilyn Dr (replacement of complete existing central heat and air system with or without duct work, Jan 13, 2025); 5901 Fairlane Dr (new construction 2-unit use duplex; unit b: 2-story 1 bedroom 1 bath with covered front porch and interior stairs leading to 2nd floor, Oct 27, 2026).

How do I get alerts for new permits at 5902 Marilyn Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78757
Email me when a new permit is filed