7307 Chimney Corners
Austin, TX 78731
7307 Chimney Corners: 1 project on record
City of Austin lists 1 filing across 1 project at 7307 Chimney Corners, Austin, TX 78731. The most recent, filed November 21, 2024, covers: “Change out t existing water heater only”.
Compiled from City of Austin records · updated Nov 21, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 21, 2024
- since Nov 21, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledChange out t existing water heater only
- AppliedJan 3, 2014
- IssuedNov 21, 2024
- WorkNov '24 – May '25
- Final inspectionDec 9, 2024
Passed final inspection Dec 9, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectChange out t existing water heater only
Change out t existing water heater only
City of Austin permitPlumbing PermitFinal- Record
- 2014-000763 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7307 Chimney Corners
What is being built at 7307 Chimney Corners?
The latest filing (City of Austin permit 2014-000763 PP, November 21, 2024) covers change out t existing water heater only.
How many permits and filings does 7307 Chimney Corners have?
1 filing across 1 project, from November 21, 2024 to November 21, 2024.
Is there other construction near 7307 Chimney Corners?
Yes. Nearby filings include 7315 Running Rope (installing a standby generator and connecting to the existing ng meter, Sep 11, 2024); 7303 Chimney Corners (replacement of complete existing central heat and air system with or without duct work, Mar 23, 2026); 7304 Lamplight Ln (new construction in-ground pool, Apr 8, 2026).
How do I get alerts for new permits at 7307 Chimney Corners?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 7315 Running RopeSep 11, 2024Installing a standby generator and connecting to the existing ng meter · 53 m away
- 7303 Chimney CornersMar 23, 2026Replacement of complete existing central heat and air system with or without duct work · 54 m away
- 7304 Lamplight LnApr 8, 2026New construction in-ground pool · 57 m away
- 7316 Running RopeJul 16, 2025Install new gas line for generator · 81 m away
- 7314 Running RopeNov 21, 2025Request to disconnect - installation of a 200 a generac ats and 24kw generator · 98 m away
- 7311 Running RopeMay 1, 2024Install irrigation system · 105 m away
- 7400 Stonecliff CvMar 28, 2025Replacement of complete existing central heat and air system with or without duct work · 110 m away
- 7403 Chimney CornersNov 21, 2024Changeout water heater to exting resid only · 114 m away
- 7312 Running RopeAug 12, 2025Total demolition of pool 200 sq ft · 116 m away
- 7212 Montana NorteOct 29, 2025Replacement of complete existing central heat and air system with or without duct work · 127 m away
- 7405 Chimney CornersAug 6, 2025Express: installation of 24 gauge standing seam metal roof (non structural and not going past decking) · 143 m away
- 3907 Greystone DrMar 25, 2026Tunnel under foundation to replace cast iron for 2 full bathrooms and half bathroom with kitchen and washer drain. will have 3 access holes one where drain line exits the foundation the second where bathroom is located on the the far right side of the home and the third access hole will be made by the garage total length of tunnel is 60 feet. sewer line will be replaced from the home to the city tap connection on the front left corner of the property total length of sewer line is approximately 55 feet · 144 m away