7312 Running Rope
Austin, TX 78731
Permit filed to demolish a 200-square-foot pool
A City of Austin permit records the total demolition of a 200-square-foot pool at 7312 Running Rope. The permit was filed on August 12, 2025, and its status is Final.
Summarized from City of Austin records · updated Aug 12, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 12, 2025
- since Aug 12, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTotal demolition of pool 200 sq ft
- AppliedAug 8, 2025
- IssuedAug 12, 2025
- WorkAug '25 – Sep '25
- Final inspectionSep 18, 2025
Passed final inspection Sep 18, 2025.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectTotal demolition of pool 200 sq ft
Total demolition of pool 200 sq ft
City of Austin permitBuilding PermitFinal- Record
- 2025-101073 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7312 Running Rope
What work is permitted at 7312 Running Rope in Austin?
A City of Austin permit records total demolition of a 200-square-foot pool. Permit 2025-101073 BP was filed August 12, 2025.
Is a pool being demolished at 7312 Running Rope?
Yes. Permit 2025-101073 BP describes total demolition of a 200-square-foot pool and has a status of Final.
When was the pool demolition permit filed at 7312 Running Rope?
The City of Austin permit was filed on August 12, 2025.
How large is the pool being demolished at 7312 Running Rope?
The permit description identifies the pool as 200 square feet.
Is a new pool planned at 7312 Running Rope?
The record provided documents demolition of a pool, but does not list a permit for a new pool.
Also being built nearby
All of 78731- 7314 Running RopeNov 21, 2025Request to disconnect - installation of a 200 a generac ats and 24kw generator · 25 m away
- 7316 Running RopeJul 16, 2025Install new gas line for generator · 47 m away
- 7311 Running RopeMay 1, 2024Install irrigation system · 51 m away
- 7315 Running RopeSep 11, 2024Installing a standby generator and connecting to the existing ng meter · 68 m away
- 3911 Greystone DrDec 5, 2024105 tunnel below the foundation to replace entire cast-iron drain system. 4 access holes - 1 on each side. 56 trench to replace yard sewer line · 73 m away
- 3907 Greystone DrMar 25, 2026Tunnel under foundation to replace cast iron for 2 full bathrooms and half bathroom with kitchen and washer drain. will have 3 access holes one where drain line exits the foundation the second where bathroom is located on the the far right side of the home and the third access hole will be made by the garage total length of tunnel is 60 feet. sewer line will be replaced from the home to the city tap connection on the front left corner of the property total length of sewer line is approximately 55 feet · 88 m away
- 3915 Greystone DrJul 2, 2025To tunnel under the foundation to replace the cast-iron drain lines at the kitchen the laundry and the bathroom and install pvc · 89 m away
- 7304 Lamplight LnApr 8, 2026New construction in-ground pool · 97 m away
- 7305 Running RopeMar 22, 2024Express: master bathroom remodel-replace fixtures (not relocating fixtures) · 107 m away
- 7212 Lamplight LnJun 6, 2024Replacement of complete existing central heat and air system with or without duct work · 111 m away
- 7307 Chimney CornersNov 21, 2024Change out t existing water heater only · 116 m away
- 3912 Greystone DrDec 10, 2025Replacement of complete existing central heat and air system with or without duct work replacement of complete existing central heat and air system with or without duct work install 2 ton american standard seer 2 rated 17 seer split system and 2 stage gas furnace · 126 m away