3912 Greystone Dr
Austin, TX 78731
Central heating and air system replacement permitted
A permit at 3912 Greystone Dr covers replacement of the existing central heating and air system. The City of Austin issued the mechanical permit on December 10, 2025; it specifies a 2-ton American Standard split system and a two-stage gas furnace.
Summarized from City of Austin records · updated Dec 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 10, 2025
- since Dec 10, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work replacement of complete existing central heat and air system with or without duct work install 2 ton american standard seer 2 rated 17 seer split system and 2 stage gas furnace
- AppliedDec 7, 2025
- IssuedDec 10, 2025
- WorkDec '25 – Feb '26
- Final inspectionFeb 3, 2026
Passed final inspection Feb 3, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work replacement of complete existing central heat and air system with or without duct work install 2 ton american standard seer 2 rated 17 seer split system and 2 stage gas furnace
Replacement of complete existing central heat and air system with or without duct work replacement of complete existing central heat and air system with or without duct work install 2 ton american standard seer 2 rated 17 seer split system and 2 stage gas furnace
City of Austin permitMechanical PermitFinal- Record
- 2025-155176 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3912 Greystone Dr
What is happening at 3912 Greystone Dr in Austin?
A City of Austin mechanical permit covers replacement of the existing central heating and air system. The permit was issued December 10, 2025.
When was the HVAC replacement permitted at 3912 Greystone Dr?
The City of Austin issued permit 2025-155176 MP on December 10, 2025.
What kind of heating and air system is specified at 3912 Greystone Dr?
The permit specifies a 2-ton American Standard split system and a two-stage gas furnace.
Does the permit at 3912 Greystone Dr include ductwork replacement?
The description allows for replacement of the central system with or without ductwork replacement, but it does not say whether ductwork will be replaced.
What is the status of permit 2025-155176 MP?
The City of Austin lists the mechanical permit as Final. It was filed December 10, 2025.
Also being built nearby
All of 78731- 3910 Greystone DrJul 8, 2025Replacement of an existing water heater replace 50 gal nat gas water heater · 23 m away
- 3908 Greystone DrFeb 5, 2024Replace cast iron under foundation · 46 m away
- 3915 Greystone DrJul 2, 2025To tunnel under the foundation to replace the cast-iron drain lines at the kitchen the laundry and the bathroom and install pvc · 49 m away
- 3916 Greystone DrDec 10, 2025Disconnect/reconnect request for replacing 200 amp meter can and upgrading 200 amp main service panel · 55 m away
- 3911 Greystone DrDec 5, 2024105 tunnel below the foundation to replace entire cast-iron drain system. 4 access holes - 1 on each side. 56 trench to replace yard sewer line · 59 m away
- 3917 Edgerock DrNov 6, 2026Eplan: residential expedited review - new construction of 2-story single-family residence [4bed 4.5bath] with attached carport and connecting workshop · 68 m away
- 3918 Greystone DrJul 15, 2025Emergency storm damage - bent riser. need to replace · 83 m away
- 3919 Edgerock DrDec 31, 2024Tunnel for main sewer line repipe up to 100 feet · 90 m away
- 3907 Greystone DrMar 25, 2026Tunnel under foundation to replace cast iron for 2 full bathrooms and half bathroom with kitchen and washer drain. will have 3 access holes one where drain line exits the foundation the second where bathroom is located on the the far right side of the home and the third access hole will be made by the garage total length of tunnel is 60 feet. sewer line will be replaced from the home to the city tap connection on the front left corner of the property total length of sewer line is approximately 55 feet · 98 m away
- 3916 Edgerock DrJul 27, 2026Replumb under pier and beam home up to exterior cleanout · 105 m away
- 3921 Edgerock DrJan 5, 2024Replacement of an existing water heater · 111 m away
- 3918 Edgerock DrAug 4, 2026Replacement of complete existing central heat and air system with or without duct work · 116 m away