3911 Greystone Dr

Austin, TX 78731

3911 Greystone Dr: 2 projects on record

City of Austin lists 2 filings across 2 projects at 3911 Greystone Dr, Austin, TX 78731 since May 22, 2024. The most recent, filed December 5, 2024, covers: “105 tunnel below the foundation to replace entire cast-iron drain system. 4 access holes - 1 on each side. 56 trench to replace yard sewer line”.

Compiled from City of Austin records · updated Dec 5, 2024

Projects
2
2 filings
Latest filing
Dec 5, 2024
since May 22, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

105 tunnel below the foundation to replace entire cast-iron drain system. 4 access holes - 1 on each side. 56 trench to replace yard sewer line

  1. AppliedNov 13, 2024
  2. IssuedDec 5, 2024
  3. WorkDec '24 – Dec '24
  4. Final inspectionDec 31, 2024

Passed final inspection Dec 31, 2024.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. 105 tunnel below the foundation to replace entire cast-iron drain system. 4 access holes - 1 on each side. 56 trench to replace yard sewer line

    105 tunnel below the foundation to replace entire cast-iron drain system. 4 access holes - 1 on each side. 56 trench to replace yard sewer line

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. *request to disconnect* replace federal pacific panel and existing 150 amp meter. new panel to be 150 amp main breaker panel 24 space. new meter to be 200 amp

    *request to disconnect* replace federal pacific panel and existing 150 amp meter. new panel to be 150 amp main breaker panel 24 space. new meter to be 200 amp

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 3911 Greystone Dr

What is being built at 3911 Greystone Dr?

The latest filing (City of Austin permit 2024-151442 PP, December 5, 2024) covers 105 tunnel below the foundation to replace entire cast-iron drain system. 4 access holes - 1 on each side. 56 trench to replace yard sewer line.

How many permits and filings does 3911 Greystone Dr have?

2 filings across 2 projects, from May 22, 2024 to December 5, 2024.

Is there other construction near 3911 Greystone Dr?

Yes. Nearby filings include 3915 Greystone Dr (to tunnel under the foundation to replace the cast-iron drain lines at the kitchen the laundry and the bathroom and install pvc, Jul 2, 2025); 3907 Greystone Dr (tunnel under foundation to replace cast iron for 2 full bathrooms and half bathroom with kitchen and washer drain. will have 3 access holes one where drain line exits the foundation the second where bathroom is located on the the far right side of the home and the third access hole will be made by the garage total length of tunnel is 60 feet. sewer line will be replaced from the home to the city tap connection on the front left corner of the property total length of sewer line is approximately 55 feet, Mar 25, 2026); 3910 Greystone Dr (replacement of an existing water heater replace 50 gal nat gas water heater, Jul 8, 2025).

How do I get alerts for new permits at 3911 Greystone Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78731
Email me when a new permit is filed